Initial Applications for Automated Vehicles on Exclusive Roadways Advanced Transit Association Annual Technical Meeting January 11, 2009 Washington, DC Robert Johnson R. E. Johnson Consulting Rockville, Maryland www.REJConsult.com
2
www.REJConsult.com2 Examples of Small Automated Road Vehicles CyberCab: proposed by 2getthere which developed the first public automated road vehicle (ParkShuttle) ULTra: scheduled to begin service in 2009 at Heathrow airport, London
3
www.REJConsult.com3 Alternative Interior Layouts and Service Concepts Typical PRT –Two fixed seats –Two fold-down seats –Could have pure PRT or some sharing “Automated Microbus” –Four fixed seats –Two fold-down seats –More suitable for shared operation
4
www.REJConsult.com4 Benefits of Exclusive Roadway Narrow -- 6 ft (1.8 m) or less wide Only need 6.5 ft (2.0 m ) vertical clearance Light duty construction Much safer without human drivers in other vehicles Much simpler control system
5
www.REJConsult.com5 Exclusive Roadway Elevated, At Grade, Under Existing Bridge
6
www.REJConsult.com6 ULTra System at Heathrow Airport
7
www.REJConsult.com7 Stations and Interchanges Similar to to ULTra system connecting Heathrow Terminal 5 to parking lot, because... Decision makers are very conservative Heathrow design suitable for a number of applications
8
www.REJConsult.com8 In Example Applications, Stations are on Loop at End of Two-Way Line
9
www.REJConsult.com9 Application Characteristics Small system -- 1 to 4 lane miles (2 to 6 lane km ) of “guideway” Extends some other mode –Rail Transit: system provides rail station access –Airport: provides landside circulation Auto congestion an issue, but... Low enough density in immediate area that space available for guideway Limited snow/ice, so can melt with guideway heating
10
www.REJConsult.com10 Applications in Suburban Washington, DC Montgomery College Connector -- College is next to heavy rail line, but between stations DANAC Station Connector -- Provides access to station on planned BRT or light rail system College Park Engineering Connector -- Serves existing heavy rail and planned BRT or light rail
11
www.REJConsult.com11
12
www.REJConsult.com12
13
www.REJConsult.com13
14
www.REJConsult.com14
15
www.REJConsult.com15
16
www.REJConsult.com16
17
www.REJConsult.com17
18
www.REJConsult.com18
19
www.REJConsult.com19
20
www.REJConsult.com20 Space Under Route 1 Bridge May be Usable for Automated Vehicle Lanes
21
www.REJConsult.com21 Next Steps in Analyzing an Application Is guideway layout really feasible? Compute infrastructure cost Determine station-to-station (free flow) travel time and average wait time Find ridership by running existing 4-step model for area with automated system in place Determine fleet size, VMT, system costs, and benefit/cost ratio
22
www.REJConsult.com22 For more information about the applications shown here and others, please see: www.AutoRoadVehicles.com