Download presentation
Presentation is loading. Please wait.
Published byElfreda Chase Modified over 9 years ago
1
Comeniusproject: waterworks Comeniusproject: waterworks March 2011 Finnland
2
Comeniusproject: waterworks Built: 1966 - 1969 Commissioning date: 1969 Conditioning of water: 194.000m³/day Waterworks/barrage Grane
3
Comeniusproject: waterworks Length of causey: 67m Height of causey: 600m Connected with other barrages: Innerste and Oker Innerste and Oker Used for: energy production flood control flood control low water raising low water raising drinking water abstraction drinking water abstraction
4
Comeniusproject: waterworks How does a waterworks work? 1. Water is collected →natural water 2. Coagulant is added →organic substances are bonded 3. Filtration with quartz sand →the flocks are separated
5
Comeniusproject: waterworks 4. Deacidification with calcium carbonate →raise pH 5. Water is fumigated →last tertiary treatment 6.Water is collected →pure water 7. Water is drinkable
6
Comeniusproject: waterworks Waste products Filter cleaned ↓ mud produced ↓ water is extracted of the mud ↓ The mud is used to produce bricks
7
Comeniusproject: waterworks Our planet 70% of the earth is covered by water. Just 3% of it is drinkable freshwater. Just one third of the freshwater is achievable for us.
8
Comeniusproject: waterworks Water consumption of a European Personal hygiene: 46L Toilet: 34L Washing: 15L Business: 11L
9
Comeniusproject: waterworks Cleaning flat and car: 7L Dishwasher: 7L Garden: 4L Food and water: 3L Altogether: 127L/day!
10
Comeniusproject: waterworks Global water consumption
11
Comeniusproject: waterworks How to save water? Taking a shower instead of having a bath Never forget to close the water tap Use water butts for the garden Buy water–saving equipment Buy food produced in your region
12
Comeniusproject: waterworks Thank you for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.