Download presentation
Presentation is loading. Please wait.
Published byEvelyn Briggs Modified over 9 years ago
1
http://www.epcc.ed.ac.uk/sungrid 1 EPCC Sun Data and Compute Grids Project Using Sun Grid Engine and Globus to Schedule Jobs Across a Combination of Local and Remote Machines Terry Sloan Edinburgh Parallel Computing Centre (EPCC) Telephone: +44 131 650 5155 Email: t.sloan@epcc.ed.ac.uk
2
http://www.epcc.ed.ac.uk/sungrid 2 Overview The Project Why do it ? Project Scenario Project Goal How ? Project Achievements The Compute Scheduler The Compute & Data Scheduler
3
http://www.epcc.ed.ac.uk/sungrid The Project
4
http://www.epcc.ed.ac.uk/sungrid 4 The Project Develop a Globus enabled compute and data scheduler Based on Grid Engine, Globus and variety of data technologies
5
http://www.epcc.ed.ac.uk/sungrid 5 The Project (cont) Partners –Sun Microsystems –National e-Science Centre represented by EPCC Timescales –23 months –Start Feb 2002 –End Dec 2003 –Feb 2003 = Project Month 13 (PM13)
6
http://www.epcc.ed.ac.uk/sungrid Why do it ?
7
http://www.epcc.ed.ac.uk/sungrid 7 Why do it? Grid Engine – over 20000 downloads (Nov 2002) –Distributed Resource Management tool –Schedules activities across networked resources Sun classifies 3 levels of Grid –Cluster Grid – a single team or project and their associated resources –Enterprise Grid – multiple teams and projects but within a single organisation, facilitating collaboration across the enterprise –Global Grid – linked Cluster and Enterprise grids, providing collaboration amongst organisations Grid Engine meets first two levels but by itself does not meet the third
8
http://www.epcc.ed.ac.uk/sungrid 8 Why do it? (cont) Globus Toolkit –A Grid API for connecting distributed compute and instrument resources Integration with Globus allows Grid Engine to meet level 3 –Collaboration amongst enterprises –Most integration efforts use Globus to submit work to Grid Engine This project tackles opposite problem - to engineer Grid Engine on top of Globus
9
http://www.epcc.ed.ac.uk/sungrid 9 Why do it? (cont) Grid Engine concerned with compute resources –Extend it to work with popular data and service access protocols (eg. OGSA-DAI)
10
http://www.epcc.ed.ac.uk/sungrid Project Scenario
11
http://www.epcc.ed.ac.uk/sungrid 11 Project Scenario Two collaborating enterprises A and B both have some machines –Both enterprises run Grid Engine to schedule jobs –Local demand for machines is variable Sometimes it exceeds supply Other times machines lie idle Grid Engine abcd AB efgh Users (A)Users (B)
12
http://www.epcc.ed.ac.uk/sungrid 12 Project Scenario(cont) Ideal Situation –If enterprises A and B could expose some of their machines to each other across the internet through Grid Engine… Both A and B could enjoy through-put efficiency improvements Large gains when one enterprise is busy while the other is idle Grid Engine abcd efgh efgh abcd AB Users (A) Users (B)
13
http://www.epcc.ed.ac.uk/sungrid The Project Goal
14
http://www.epcc.ed.ac.uk/sungrid 14 Project Goal Final goal –Develop a scheduler based on Grid Engine to schedule jobs across a combination of local and remote machines –Enable jobs to access necessary data sources –Use Globus as the Grid API to provide secure communications and transfer Development Criteria –Industrial strength –Application of software engineering techniques –Use of industry standard design and analysis tools –Migration to OGSA-compliant Globus 3
15
http://www.epcc.ed.ac.uk/sungrid How ?
16
http://www.epcc.ed.ac.uk/sungrid 16 Workpackages WP 1: Analysis of existing Grid components WP 1.1: UML analysis of core Globus 2.0 WP 1.2: UML analysis of Grid Engine WP 1.3: UML analysis of other Globus 2.0 –WP 1.4: UML analysis of Globus 3.0 –WP 1.5: Exploration of data technologies WP 2: Requirements Capture & Analysis WP 3: Prototype Compute Scheduler WP 4: Compute/Data Scheduler Design WP 5: Compute/Data Scheduler Development
17
http://www.epcc.ed.ac.uk/sungrid 17 The Project Team Project Personnel –Terry Sloan : Project leader –Geoff Cawood : Project architect –Ratna Abrol : Engineering –Thomas Seed : Engineering –Ali Anjomshoaa : Globus 2 Analysis –Paul Graham : Requirements Capture and Analysis –Amy Krause : Technical reviewer Project Review Board –Fritz Ferstl (Sun Microsystems Gmbh) –John Barr (Sun Microsystems Ltd) –Steven Newhouse (London e-Science Centre) –Neil Chue Hong (EPCC)
18
http://www.epcc.ed.ac.uk/sungrid Achievements
19
http://www.epcc.ed.ac.uk/sungrid 19 Achievements Publications –D1.1 Analysis of Globus Toolkit V2.0 –D1.2 Grid Engine UML Analysis –D2.1 Use cases and requirements –D2.2 Questionnaire Report –D3.1 Prototype Development: Requirements Software –Transfer-queue Over Globus (TOG)
20
http://www.epcc.ed.ac.uk/sungrid Transfer-queue Over Globus (TOG) - A Compute Scheduler
21
http://www.epcc.ed.ac.uk/sungrid 21 Transfer-queue Over Globus (TOG) Grid Engine abcd e efgh d A B Globus 2 User A User B Integrates Grid Engine and Globus 2 to access remote resources GE execution methods provide job submission and control GE job context stores job specific information eg job handle Globus GSI for security Globus GRAM enables interaction with remote resource GASS for small data transfer, GridFTP for large datasets
22
http://www.epcc.ed.ac.uk/sungrid 22 TOG (cont) Current Status –Secure job submission functionality implemented and tested Staging of input data and executables and transfer of output –Secure job control functionality implemented and tested Suspend, Resume, Terminate –Basic scheduling functionality implemented and tested Schedules jobs to remote resources when local resources are full –Testing Integrated successfully within Grid Engine test suite Tested through firewalls TOG software available upon request –Contact sungrid@epcc.ed.ac.uk Generally available via web site soon –www.epcc.ed.ac.uk/sungrid
23
http://www.epcc.ed.ac.uk/sungrid 23 TOG (cont) Pros Simple approach Usability – existing Grid Engine interface, users only need to be aware of Globus certificates Remote administrators still have full control of their resources
24
http://www.epcc.ed.ac.uk/sungrid 24 TOG (cont) Cons Low quality scheduling decisions (?) –May be a time-lag in getting query results back from remote resource –Incorporating data transfer costs into scheduling Mirror queues for remote resources Possible set-up overhead Globus 2 vs. Globus 3 Grid Engine specific solution
25
http://www.epcc.ed.ac.uk/sungrid The Compute & Data Scheduler
26
http://www.epcc.ed.ac.uk/sungrid 26 Current status Considering two possible routes Extend TOG –Migrate to Globus 3 –Incorporate OGSA-DAI Hierarchical Scheduler –Overcome limitations –Global Grid vision
27
http://www.epcc.ed.ac.uk/sungrid 27 1. Extend compute scheduler Compute Grid Data Grid GE GridFTP SiteSRBOGSA-DAI (Hides ODBC, JDBC, XMLDB etc.) Globus
28
http://www.epcc.ed.ac.uk/sungrid 28 2. Hierarchical Scheduler Unified Interface –Grid Scalability Grid Engine Hierarchical Scheduler Web Services Layer Hierarchical Scheduler Web Services Layer Scotland Edinburgh EPCC Query child DRMs for capabilities Pass Job Specification to the child Same Interface
29
http://www.epcc.ed.ac.uk/sungrid 29 Conclusions Before proceeding Examine Globus 3 Analysis Examine Data Technologies ie OGSA-DAI, etc Informed decision on whether to –Extend Compute Scheduler, or –Build Hierarchical Scheduler or some sub-set of this. Delivery in December 2003
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.