Presentation is loading. Please wait.

Presentation is loading. Please wait.

15 Sediment Gages ~2,000 samples per year 7 Cooperators 5 Technicians in 3 offices Project Oriented – Dam Removal – Restoration OPERATIONAL NOT A RESEARCH.

Similar presentations


Presentation on theme: "15 Sediment Gages ~2,000 samples per year 7 Cooperators 5 Technicians in 3 offices Project Oriented – Dam Removal – Restoration OPERATIONAL NOT A RESEARCH."— Presentation transcript:

1

2 15 Sediment Gages ~2,000 samples per year 7 Cooperators 5 Technicians in 3 offices Project Oriented – Dam Removal – Restoration OPERATIONAL NOT A RESEARCH focus – i.e. 5 Sediment Acoustic sites slow addition 13 5 4 4 2

3 14 mi 2 drainage area Up-looker used Nearly 100 % fines in suspension No near field corrections

4

5

6 1,636 mi 2 drainage area Up to ~25 % sands in suspension Side-looker: on-going problems with debris on instrument Wake zone?

7 Partial cleanup of data (negative slopes taken out) Results with only two cells used -no near field correction -wake zone?

8

9 FISP Funded 2011-2012

10

11 Automation Software Development Beta Sediment Stationary Add-in by Boldt, Szupiany, Czuba, and Oberg into VMT by Parsons, Jackson, Czuba, Mueller, and Oberg

12 Beta Add-in Animation

13

14 Previous Peak 37.24’Previous Peak 34.56’ Previous Peak 39.01’Previous Peak 26.04’

15

16

17

18

19

20


Download ppt "15 Sediment Gages ~2,000 samples per year 7 Cooperators 5 Technicians in 3 offices Project Oriented – Dam Removal – Restoration OPERATIONAL NOT A RESEARCH."

Similar presentations


Ads by Google