By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.

Similar presentations


Presentation on theme: "By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long."— Presentation transcript:

1 By: Caleb VanderWal

2  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long you run risk of the whole barn getting knocked down)

3

4  Even out the heights of the boards  Use a laser level to mark off the tops at the same height

5

6  Place the horizontal post beams  Cut notches into the board to make putting them on easier.  Hardest of the beams to put up  Use your level to make sure they are level to the ground  Secure with screws to make sure they are stable

7

8  Build the trusts  Need a board that runs parallel to the ground and two additional boards that meet in the center at an angle  Measure the board to fit the board in step three and then choose the angle at which you want the board  Put notches into the boards on step 3 where you want your trusts laying.

9

10  Add additional beams for support  Theses will be your support for your roof  Be sure to use a level to make sure they are perpendicular to the boards they are close to  At least one additional board should be placed on each section

11

12  Add the sidings  Take your ply-wood and cut it to size  Nail it to the support boards on the outside edge

13

14  Add the roof  If it is metal you will need to cut them to fit  Install them by taping the screws in over the struts.

15


Download ppt "By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long."