Download presentation
Presentation is loading. Please wait.
Published byRichard Emory Ferguson Modified over 9 years ago
1
REVIEW APPROVAL AND RECORD KEEPING PROCEDURE
2
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 2 Use Change Management System (CMS) to approve reviews To shorten the turn around time of obtaining approvals from both SPML and SPSV review committee members Recordkeeping of passing and non-passing reviews Control access to presentations using DMS Objectives
3
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 3 All product, process, equipment, and test reviews for new designs or changes should use this procedure. EPR (Level 0 - 4) PCR (Level 1- 4) SPC (Level 1- 6) TLD (Level 1- 4) TCR CR Other Related Reviews NOTE: Stage Gate Reviews are saved in the PMO intranet Reviews to be logged
4
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 4 Why Keep Reviews? The presentation materials includes important information that could be pertinent in the future. As a tool for tracing what happened in the past. Previously, reviews were to be e-mailed to DCON after passing and then archived in the Outlook Public Folders. As of Q206, >300 EPRs that had passed still needed to be sent to DCON.
5
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 5 Passing Guidelines A presented review with Gating ARs does not pass. A review is not passed until it is in the DMS (not just uploaded as an ECN). A logged review should gate passage of the NEXT stage gate review, e.g.SPC5 cannot pass if SPC4 is not logged
6
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 6 Passing and non-passing presentations are stored in the DMS - Document Management System Where Stored?
7
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 7 Whose approval? Approvers are usually identified in the applicable templates which are located in the DMS. Presenter must bring the Presentation Review Attendance Sheet (001-09956) to the presentation. At least 75% of the approvers is needed to start a meeting. If a quorum is achieved, those who are not present (the 25%) and do not send a delegate approve automatically. Presenter should get all required hard-copy signatures at the end of the review meeting. (this must be done real time) People who are on remote like Videocon, conference bridge, must give their verbal approval and the presenter records their approval in the attendance sheet as “Verbal approval by via and witnessed by ” with signature of witness (not the presenter). Presenter then scans the Presentation Review Attendance Sheet (001-09956) paste into the presentation and uploads to CMS with DCON as the only approver.
8
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 8 Presentation Review Attendance Sheet (001-09956) Complete this form before presentation, including filling out the names of the Required Attendees base from defined approvers per review If 75% of the required attendees (or delegates) were present, proceed with the presentation. The 25% were considered automatically approved Ask the actual attendees to affix physical approval (signature) in the attendance sheet. This must be done “real time” (right after the presentation) For approver who are on remote access, ask their verbal approval, write their verbal approval opposite to their names, witness must affix signature Sign Minutes taker / Verified by portion Scan attendance sheet, paste in slide2 of the presentation
9
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 9 OBTAINING A DOCUMENT NUMBER IN DMS (before presentation)
10
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 10 Key-in title “take note of the naming convention” Product = Cell, Module, or Systems Tool = Vendor name, Machine (e.g. MRL Diffusion Furnace) Line = Line applicability (e.g.. Line2, Line8, Line 12, etc.) Review = EPR, CR, SPC etc. Level = SPC6, EPR4, EPR1.5 etc. Select appropriate Category Request a Document Number in DMS All presentations will be registered in DMS
11
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 11 Request a Document Number in DMS This step requests final confirmation of entered information. Click appropriately either on Back or Create button. SUNPOWER CELL REVIEW SUNPOWER CELL RANTEX L5-6 EPR1 STEPSTEP 32 4 This document number should be included in the presentation before it is presented.
12
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 12 BEFORE UPLOADING TO CMS
13
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 13 Complete AR’s and make whatever necessary modifications to slides to reflect AR completion. Scan the completed Presentation Review Attendance Sheet (001-09956), paste it in slide 2. For EPR’s and PCR’s, Update the AR Status Review Slide - should include AR’s from past and current EPR’s. Modifications to Presentation
14
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 14 Non-passing or Failing Review should also be submitted by the presenter as an ECN. Add gating and non-gating AR’s to the presentation Add ‘watermark’ on master slide to include “Presented Not Passing” Start ECN. In “Description of Changes” add “Presented. “Not Passing” Include DCON admin as the only approver of the ECN When ARs are complete, download the presentation from DMS and make necessary changes If presentation is required, then present to review committee, otherwise send via e-mail Document the result whether passing or not as a revision to the existing document, updating document number revision to *A Repeat until review passes Non-passing Reviews Presented : May 11, ‘08 Result : Not Passing
15
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 15 UPLOADING PRESENTATIONS INTO THE CMS
16
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 16 - From the SPML or SPSV intranet, click on “Change Management System” Key-in Cypress Initials and password. Access to CMS
17
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 17 Initiate ECN
18
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 18 SunPower Cell Reviews SunPower Module Reviews SunPower System Reviews Upload source and pdf files. All these categories are restricted and have limited access for- viewing. Only selected individuals can view. Initiate ECN
19
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 19 Source–.ppt presentation PDF –.pdf file Document Number Format: 001-xxxxx Enter exactly as in DMS and on document File name of the presentation to be uploaded should start with the document number Example: 001-10056 Initiate ECN New Rev Enter ** for initial issue. Increment by one level if document is a revision. Current Rev New document? leave this blank. Revision? Enter current revision level **, *A,*B,*C …
20
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 20 take note of the naming convention at every slide of the presentation:” Product = Cell, Module, Systems Tool = Vendor name, Machine (e.g MRL Diffusion Furnace) Line = Line applicability (eg. Line2, Line8, Line 12, etc.) Review = EPR, CR, SPC etc.. Level = Level of presentation (eg. SPC6, EPR4, EPR1.5 etc.) Presentation Naming Convention Enter presentation Doc # and revision status (document number from DMS)
21
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 21 In the “Reason for Change” box, specify the date of review and it’s result. (Reviews w/ gating AR’s are considered “Not Passing.”) Initiate ECN -DCON will be the only approver of the ECN -Submit the ECN for approval
22
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 22 Upon release of ECN in the Document Management System (DMS) the originator, normal review committee members, and alternate signers will be notified that a certain review had been released in the DMS. They will also be given an access to the document. Automatic Notification in DMS
23
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E
24
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 24 PROCESS FLOW Present Review At the end of presentation, ask for physical signature of the actual attendees (required / alternate approvers) in the Presentation Review Attendance Sheet (001- 09956) Needs Revision? Yes No Yes Download source file from DMS, update presentation, level up revision status, present to the board and ask approval. Presentation is kept in the DMS Create ECN and upload the presentation with signed attendance sheet (001-09956) add DCON as the only approver of the ECN Release the Review in DMS
25
001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362 Rev*E 25 - END -
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.