Download presentation
Presentation is loading. Please wait.
Published byBarrie Phelps Modified over 9 years ago
1
Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05
2
Bright SCC signs grace the front yards of all our schools
3
Tatem Classroom Classroom New Unit Ventilator
4
Tatem Exterior Brick Re-pointing
5
HMHS A Wing Classroom Renovation
6
HMHS B Gym Access to new heating units on roof to be installed in this opening.
7
Central-Middle School Roof Work
8
Middle School Classroom New Unit Ventilator to be installed
9
Middle School Gym Floor Old Surface Removal
10
Middle School Restroom Renovation
11
Central School Classroom This classroom is getting a new unit ventilator installed.
12
Elizabeth Haddon Restroom This group restroom is ready for new fixtures.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.