Ben Caya Carl Czajka 5th Update. Ordered and Received Kettle – Ordered Valves – In Thermometers - In.

Similar presentations


Presentation on theme: "Ben Caya Carl Czajka 5th Update. Ordered and Received Kettle – Ordered Valves – In Thermometers - In."— Presentation transcript:

1 Ben Caya Carl Czajka 5th Update

2 Ordered and Received Kettle – Ordered Valves – In Thermometers - In

3 Free and Received Ordered Working on donation

4

5

6

7

8 o Gas piping o Bolt on Pumps (bracket already welded in) o Pump wiring Central power Wire switch o Weld on castors o Weld on propane tank holder o Brew Beer

9 WBSTasks Task Lead StartEnd Duration (Days) % Complete Working Days Days Complete Days Remaining 23 - Jan - 1230 - Jan - 12 06 - Feb - 1213 - Feb - 1220 - Feb - 1227 - Feb - 12 05 - Mar - 1212 - Mar - 1219 - Mar - 1226 - Mar - 12 02 - Apr - 12 1 Initialize Project 1/23/122/15/123100%1830 1.1 Partner Assign 1/23/121/24/122100%220 1.2 Choose Project 1/23/121/25/123100%330 2 VOC and Design Requirments 2/16/122/29/1214100%10140 2.1 HBT Design Pole 2/16/122/22/127100%570 2.2 Design Requirments 2/16/122/18/123100%230 2.3 Bi-Weekly Report #1 2/25/122/29/125100%350 2.4 Oral Presentation #1 2/25/122/29/125100%350 3 VOC and Design Requirments 2/16/122/29/1214100%10140 3.1 HBT Design Pole 2/16/122/22/127100%570 3.2 Design Requirments 2/16/122/18/123100%230 3.3 Bi-Weekly Report #2 2/25/122/29/125100%350 3.4 Oral Presentation #2 2/25/122/29/125100%350 4 Design Selection 3/01/123/14/121477%10 4 4.1 Select Design 3/01/123/04/124100%240 4.2 CAD Models 3/04/123/10/127100%570 4.3 FEA Analysis 3/10/123/14/1250%305 4.4 Bi-Weekly Report #3 3/12/123/14/123100%330 4.5 Oral Presentation #3 3/12/123/14/123100%330 5 Manufacturing Design 3/15/124/04/122136%15714 5.1 Parts List 3/15/123/19/12590%341 5.2 Order Parts 3/19/123/21/12330%303 5.2.1 Steel for Frame 3/19/123/25/127100%570 5.2.2 Heating 3/19/123/25/1270%507 5.2.2.1 Burners 3/19/123/25/1270%507 5.2.2.2 Piping 3/19/123/25/1270%507 5.2.2.3 Pilot Lighting 3/19/123/25/1270%507 5.2.3 Pumps (2) 2/27/123/27/123025%22723 5.2.4 Hoses for Pumps 3/19/123/25/1270%507 5.2.5 Valves 3/19/123/25/127100%570 5.2.6 Kettles 3/19/123/25/127100%570 5.2.7 Thermometers 3/19/123/25/127100%570 5.2.8 Heat Exhanger 3/19/123/25/1270%507 5.2.9 Castors 3/19/123/25/1270%507 5.3 Frame and Accessory Assembly 4/01/124/04/12430%313 5.4 Bi-Weekly Report #4 4/02/124/04/123100%330 5.5 Oral Presentation #4 4/02/124/04/123100%330