Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project.

Similar presentations


Presentation on theme: "Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project."— Presentation transcript:

1 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Summary Acknowledgments Kendall Slivka Construction Management Advisor: Robert Leicht

2 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments General Building Data LocationRt 715 & Railroad Drive Pocono Township, Monroe County, PA OccupantNorthampton Community College FunctionGymnasium, Fitness Center, Cafeteria, Conference Rooms Size68,000 SF Number of StoriesOne Story with Basement Dates of ConstructionJanuary 2012- January 2014 Project Delivery MethodDesign-Bid-Build Cost$18 Million LEED certificationSilver

3 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments “We believe that learning thrives when there is a sense of curiosity and excitement about the world in which we live. As such, we value: Excellence, Innovation, Sustainability, Accountability, Integrity, and Engagement.”

4 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

5 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

6 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

7 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

8 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Problem Statement: Braced walls interfere with building expansion and curtain walls. Research Goal: Resize columns to withstand load, and compare costs of each alternative.

9 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System Estimate: FrameLocationSizeLength Unit Weight (lb/ft) Total Weight (tons) BF 18 and 9W14X3816.6380.3154 HSS8X8X5/1621.531.840.34228 W14X3816.67380.31673 HSS8X8X5/1621.531.840.34228 W14X3816.67380.31673 HSS8X8X5/1621.531.840.34228 W12X7948791.896 W12X6550.77651.650025 BF 2D and CW24X5522.5440.495 HSS8X8X1/432.325.820.416993 W14X3822.5380.4275 HSS8X8X1/426.425.820.340824 W21X5022.5500.5625 W10X4957491.3965 W10X4957491.3965 System Estimate $84,000

10 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments System Estimate $94, 300 Proposed System Estimate:

11 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Problem Statement: The system being used seems redundant and will be expensive. Research Goal: Redesign the system so that only one layer of sprinkler heads is needed.

12 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments

13 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System Estimate: System Total $239,500

14 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Proposed System: - Wet System - Code Requirements Remain Same - Keep Water Storage Tank - Paint Exposed Ceiling Space System Total $187,500

15 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Problem Statement: The single-ply TPO system may not be able to withstand the mixture of environmental factors and sloped angles. Research Goal: Determine a new system that is proven to work, and will be economical.

16 Roof TypeRoof SectionArea (ft2) 1B36190 1B47467 1B54926 1B9940 1B10920 1B11770 SUM21213 2B111549.7 2B24556.72 2B63020.94 2B710748.75 SUM29876.11 2A8501 2A12644 2A13440 SUM1585 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System: Single Ply TPO 4” insulation (2B) 1½” insulation(2A) Modified Bitumen 4” insulation (1B) System Estimate $246,800

17 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Proposed System: Modified Bitumen 4” insulation 1 ½” insulation System Estimate $307,570

18 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Problem Statement: Constructability issues with retaining wall show a larger issue with the use of multiple prime contractors. Research Goal: Study industry feelings toward multiple prime contracts to gauge what would be a better delivery method.

19 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Multiple Prime Contracts: -Pennsylvania Separation Act 1913 -Projects > $4,000 -Separated between 4 trades -Publically Bid -Risk stays with owner Owner Electric HVAC GC Plumbing CM

20 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Industry Survey: - Most polled from Pa - Majority CM, contractor - Prefer design-bid-build - Prefer GMP contract - Most familiar with CM at risk/multiple prime

21 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Braced Frame Analysis Fire Suppression Redesign Roofing System Analysis Delivery Method Study

22 I’d like to thank everyone involved with my Thesis project; - Team members at D’Huy Engineering, most especially Jim Hana and Joseph Herman. Thank you for taking the time to walk me through the site every chance you got, and thank you for your availability. - Rob Leicht, thank you for always steering me in the right direction. - Northampton Community College for allowing me to use their project - All participants in the industry survey - My structural option friends that helped with my structural systems - My sisters for helping me concentrate and keeping me focused - My family for always encouraging me.