TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU 108288 Chambers, detector ELMB 2..4500.

Similar presentations


Presentation on theme: "TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU 108288 Chambers, detector ELMB 2..4500."— Presentation transcript:

1 TPC DCS update

2 CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU 108288 Chambers, detector ELMB 2..4500 PVSS II HVrod Heinzinger 1 High Voltage Low VoltageFEETemp. MonitorVery High Voltage TPC (1) E HVLV E HV S Control room (ACR) 23/01/07 Ethernet switch E E DIMsrv DDL HVrod ELMB 16 VHV Curr. Monitor C ISEG OPCserver PVSS II OPC client 1 Wiener OPCserver PVSS II OPC client ELMB OPCserver PVSS II OPC client 18 CR3 [FED] DIMserver DIMclient PVSS II DIMclient 10216112 Chambers Gating pulser 72 Calibr. pulser PVSS II Virtual Serial Eth.-RS232 E PS 2 Pulser system 216 PLC 1 Modbus/TCP E 2612 User interface CR3 WTS PVSSII Database(s) 1 2345 C PEAK USB-CAN ACC 1 U C Systec USB-CAN U 6 ACC 910 12

3 LHut SG2 CR3 LHut [Motion] [Laser] SG2 CR5 SG2 UX-C Ethernet TPC (2) VHV rod Cooling Thermal Screen(s) PLC 18? Thermal Screen(s)Laser calibration system. Mirror control Video cameras Gas system PLC Gas E HVrod 4 Cooling Plant (TS) Detector PVSS II DIP [TS/CV] [GWG] Cooling Plant (ch) PLC Chamber Cooling E Chambers, detector 40 PVSS II Modbus/TCP TS/CV SCADA Gas [Vision] DIMserver/ filesystem FrameGrab PVSS II DIMclient Eth.-RS232 DIMserver PicoMotor Laser Video Drift velocity mon. PVSS II Gas PVSS 29/01/07 7 11 8 DCS board DIMsrv DIMclient E SG2 [Goofie] DIMserver13 Drift velocity analysis DIMclV.Ser. E E E 221164

4 HV Status: –PVSS + FSM based on OPC 4.03 –PVSS 3.1 –FSM based on standard from 2005 To Do –PVSS 3.6 –Update to latest OPCnew –Adopt to FSM configurationnew –New USB interface Performance? –Adopt to Oracle DB –Bring closer to Alice standards

5 LV Status –Version for PL508 incl. FSM –PVSS 3.1 ToDo –PVSS 3.6 –New device: PL512 Similar but details are important for FSM –Adopt to FSM configuration –Adopt to Oracle DB –Bring closer to Alice standards Interlock –soft interlock to shut down FECs –delayed interlock from cooling system

6 Temperature monitoring Status –System put in operation during pre-commissioning –PVSS 3.1 –Pre-commissioning including Amanda server To Do –Re-cable CAN BUS in-between ELMBs –PVSS 3.6 –New interface –Add FSM Simple: ON/OFF –Adopt to Oracle DB –Finalize Sensor information

7 FEE Status PVSS –API implementation in PVSS –Panels + Archiving To Do PVSS –Debug + benchmark –Add FSM Mirror of State on level of RCU To Do –System integration FEE Laboratory

8 VHV Status –Available during pre-commissioning ToDo –Installation in CR4

9 Pulser Status –Gating pulsers tested –Power supplies + port server available To Do –Power supply Zentro PS with RS232 –Ongoing, prototype PVSS control + FSM –Pulser monitoring + control RS232 –Previous design but HW not yet available DCS Board –Firmware –PVSS integration

10 Laser system Status –Laser Control used during pre-commissioning –Auto tracker used during pre-commissioning ToDo –Mirror Control –Visualize Frame grabber -> PVSS

11 Drift Velocity Monitor Status –Hardware + Analyze Software Goofy system stand alone To Do –Integration PVSS –FSM States: ON OFF..

12 Cooling Status –Cooling plant TS/CV SCADA To Do –Import parameters into sub-detector DCS –Control from sub-detector DCS –Common for all sub-detectors SCY file to configure FW component Interlock pressure valves Connected to DSS Monitoring via DSS

13 Gas Status –Gas system with control To Do –Import parameters into sub-detector DCS –Common for all sub-detectors interface

14 DSS System Ambient pressure? –Pressision? Humidity?

15 FSM Hierarchy GasD Crate OROC HV IROCMISC Ch....... ROCLASERTEMPFC TPC GPulser VHVRCool Ch....... Ch....... Ch TSen Gating PS Ch CalibP....... CPulser Ch PS Ch....... Screen SSWCone LaserC PSCalib MirrorC ImageMirror 36x(2x) 36x10x98x??x72x??x +500x GasDCO 2 ROC Detector GAS D mon FERO ESC ECoolLV FED RCU....... 6x ESC....... 36x …

16 TPC Commissioning 2007 DCS usage dates limited versionTPC Comm. HVearly May LVend FebruaryMay TempMay FEEMay VHVMay PulserMay/June LaserJune GoofieMay CoolingAprilMay GasMay FSMMarchMay DCS Commissioning Meeting 23.01.07 with ACC team