Download presentation
Presentation is loading. Please wait.
Published byPriscilla Adams Modified over 9 years ago
1
上海天文台 Shanghai Astronomical Observatory Recent VLBI Activities in China Zhi-Qiang Shen (Shanghai Astronomical Observatory) 2009 East Asia VLBI Workshop 18-20 March 2009, LG Convention Hall of International Education Building at the Ewha Woman's University, Seoul, Republic of Korea
2
上海天文台 Shanghai Astronomical Observatory 2460 2158 3249 1114 2476 1920 CVN (4 stations+ soft-/hard-ware correlator) 1993(25m) 1987(25m) 2006(50m) 2006(40m) 2006(correlator)
3
上海天文台 Shanghai Astronomical Observatory Diameter: 25m Band: L, S/X, C, K Recording system: MK2, S2, MK3, MK4, MK5A CVN—Shanghai station (1987)
4
上海天文台 Shanghai Astronomical Observatory CVN—Urumqi station (1993) Diameter:25m Band: P, L, S/X, C, K , (also 30 and 49 cm) Recording system: MK2, MK3, MK4, MK5A, K-4 , K-5
5
上海天文台 Shanghai Astronomical Observatory CVN—Kunming station (2006) Diameter; 40m (central 25m:full panel; 25 - 40m: mesh) Band : S/X Recording system: MK5A
6
上海天文台 Shanghai Astronomical Observatory CVN—Beijing station (2006) Diameter:50m (central 30m: full panel; 30-50 m: mesh) Band: S/X Recording system: MK5A
7
上海天文台 Shanghai Astronomical Observatory Mobile VLBI—Yunnan (2000) A Mobile VLBI System with 3m antenna was constructed by ShAO for the Xi’an Surveying and Mapping Institute in 2000 which is located in the Yunnan Astronomical Observatory. S/X
8
上海天文台 Shanghai Astronomical Observatory CVN -VLBI data processing center Hardware correlator (5 stations) Software correlator (4 stations) Output data: CE-1 format FITS format (available?) Software for CE-1 data processing (near real time, in 5 min.)
9
上海天文台 Shanghai Astronomical Observatory CVN - Application to CE-1 16hX2 48hX1 24hX3 6d 12h 3.5h 2h 调相轨道段 地月转移轨道段 月球捕获轨道段 环月轨道段 Orbit determination: USB+VLBI VLBI tracking distance > 20000km elevation > 5 degree output data: delay, delay rate, angular position output delay time: < 5 minutes
10
上海天文台 Shanghai Astronomical Observatory VLBI Corrlator Post-data processing Angular position calculations O.D. delayDelay rate VLBI Center Control center in Beijing <5 minutes later VLBI center in Shanghai Dec.R.A.
11
上海天文台 Shanghai Astronomical Observatory Chang’E National project 回 :returning 绕 :Orbiting CE-1:Oct 2007 (482d/494d) CE-2: ~2010 绕 :Orbiting CE-1:Oct 2007 (482d/494d) CE-2: ~2010 落 :Landing CE-3:~2012 落 :Landing CE-3:~2012
12
上海天文台 Shanghai Astronomical Observatory Ending of CE-1: March 1, 2009
13
上海天文台 Shanghai Astronomical Observatory e-VLBI 28 August 2007: Shanghai –Australia & Europe (256Mbps) 17 June 2008: Shanghai –Australia & Japan (512Mbps) 6 January 2009: Shanghai-Urumqi (256Mbps) 15-16 January 2009: IYA marathon obs. (Asia, Australia, Europe, America)
14
上海天文台 Shanghai Astronomical Observatory FAST- Five-hundred-meter Aperture Spherical Telescope Unique Karst depression as the site Active main reflector Cable - parallel robot feed support Approved in Nov 2005; Start full construction in 2009; 9 bands from 70MHz to 3 GHz (Expected) 2014
15
上海天文台 Shanghai Astronomical Observatory New 65m telescope in Shanghai Specs: 8 bands (1.4–43 GHz); active surface; operational at S/X bands before the end of 2012 … (refer to the talk by Bin Li for details)
16
上海天文台 Shanghai Astronomical Observatory CVN by 2014 Thanks!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.