QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG - 03/22/2010
2
QAD Proprietary Agenda MFG/SC - Key Strategic Initiative Production Scheduling Objective & Challenges Workbench Framework Introduction Roadmap Production Scheduling Futures Demo Early Adopter Program Wrap Up
3
QAD Proprietary Key Strategic Initiative Provide a workbench for each key role in the Manufacturing and Supply Chain areas
4
QAD Proprietary Production Planning & Execution Production Scheduling Workbench (PSW) Master Schedule Workbench (MSW) Production SchedulingRelease To shop FloorExecutionMaster Scheduling Months-Weeks-DaysDay-Shift-IntervalsDays Component Available Check (CAC) Integration Maximize Production Efficiency Release to production with verification of available materials Create a masterschedule balancedto Supply /Demand/Resources Production Planning & Execution
5
QAD Proprietary Production Scheduler’s Objective Establish a Production Schedule that Meets Requirements – Measurements : On Time Production Deliveries – Minimize order lateness Short Lead Times – Better Customer Responsiveness Minimal Work-In-Process – Reduced inventory investment – Improving quality Maximum Utilization of Resources – Machines – Materials – Manpower » Reduced set up costs/time
6
QAD Proprietary Production Scheduler’s Challenge Finance Engineering Materials Manufacturing Quality Work-In-Process inventory is too high and there seems to be excessive labor costs. Engineering Change Orders must be implemented smoothly to the shop floor. Are all production compliance issues and procedures being followed and met? Why are scrap costs rising? Do you have all the material to start production? Supplier “X” will be late with their order! There are too many last minute changes! Have you planned for machine downtimes? Will you meet production due dates? Five workers are out sick!
7
QAD Proprietary Production Scheduling Challenge
8
QAD Proprietary Common Scheduling Situation
9
MSW & PSW Framework Introduction
10
QAD Proprietary Planning & Scheduling – Future Flow Period - > Month - > Week - > Day - > Shift - > Interval - > hour Initial plan is created by the system MRP (traditional) Leveling (new) GRC (new) Demand Received Balance demand / supply /resources to ensure a feasible and level production plan. Production Planned Sequence production orders by item attributes and resource allocations to Optimize shop floor Production Scheduled Verify materials available Release orders Print work orders and schedules Production Dispatched Monitor Production & Manage Production Order Production Reported Base MSW PSW Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order Header Attributes Operation Attributes Date & Times Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order Header Attributes Operation Attributes Date & Times Many new capabilities + 60> reports, inquiries, maintenance and process programs rolled up into the new Production Scheduler Production Planned Production Scheduled Production Dispatched Production ReportedDemand received CAC Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum MSW PSW Base CAC MSW/PSW/CAC Together - Consolidation of 50 maintenance, report and inquiry programs - New capabilities (production scheduling, integrated component checking)
11
QAD Proprietary Framework Introduction Master Scheduling (MSW) Scheduling view designed for the purpose of master scheduling
12
QAD Proprietary Framework Introduction Production Scheduling (PSW) Scheduling view designed for the purpose of production scheduling
13
QAD Proprietary Framework Introduction Search Panel extracts content for both workbench views Navigator Panel drives content focus of both workbench views Supporting Frames apply seamlessly to both workbench views
14
PSW: Layout Introduction
15
QAD Proprietary Production Order Browse Locate un-sequenced production orders by attributes (red/yellow) (large/small) Production Order Sequence Grid Schedule and sequence production orders by item attributes - Create a schedule by (release date, shift, sequence) Drag & Drop the orders to the desired position on the Sequence Grid Production Order Maintenance View and maintain all order details
16
QAD Proprietary
17
PSW: Views Create customized workbench layouts
18
QAD Proprietary Views Provides ability to create different user defined workbench layouts and save them for quick access Saves Filter/Sort/Group Settings of each Panel Saves Panel Size
19
QAD Proprietary Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side
20
QAD Proprietary 20 201020122014201520112013 Standard Edition June 2010 : QAD 2010 SE release Core Functionality : - Production Scheduling Workbench (PSW) Order Based - PSW integrated Component Check Capabilities PSW Roadmap
21
QAD Proprietary 21 201020122014201520112013 Enterprise Edition September 2010 : QAD 2010.1 EE release Core Functionality : - Production Scheduling Workbench (PSW) Order Based - PSW integrated Component Check Capabilities PSW Roadmap
22
QAD Proprietary Op 10 Work Center Extrude Day 1 Day 2Day 3 Routing Operations Pacemaker – Flow rate across all operations Day 4 WO Release Date Op 20 Work Center Assemble Op 30 Work Center Paint Op 40 Work Center Inspect Pacemaker-OP WO Due Date OP 20 Release/Due Order Based Scheduling Single Operation Scheduling Multi Operation Scheduling WO Release Date WO Due Date Scheduled-OP OP Release/Due Order Release Date WO Due Date Scheduled-OP OP Release/Due Production Line / Process
23
QAD Proprietary 23 201020122014201520112013 Enterprise Edition March 2011 : QAD 2011 EE release* Core Functionality : - Production Scheduling Workbench (PSW) Operational Scheduling * Subject to change PSW Roadmap
24
QAD Proprietary WO & Date Conflict! WO Due Date Anchored? Operation Conflict! DueRelease DueRelease Due 1 1 2 2 ReleaseDue 4 days (WO Duration) 4 days (WO Duration).8 days (Inter-OP Duration).8 days (Inter-OP Duration) 1.5 days (OP Duration) 1.5 days (OP Duration) 3 3 4 4 Operation Sequenced? No Back Schedule Date Conflict! Yes 5 days (WO Duration) 5 days (WO Duration) No Alternate Scenario Operational Scheduling
25
Demo
26
QAD Proprietary Production Scheduling Workbench Value Reduces production scheduling time and complexity Increases shop floor optimization Ability to simulate changes Removes need for spreadsheets
27
QAD Proprietary Interested In Being An Early Adopter? Early Adopter Criteria: –.Net use with QAD Enterprise Applications – eB2.1, SP4 or higher – Using QAD Enterprise Applications Discrete Work Orders or Advanced Repetitive No or verified customizations – High data integrity/accuracy BOM’s, inventory records, clean MRP data etc. – Verified business need for MSW, PSW and integrated component check capabilities – Resource availability from May 10 th through around July 12 th Project Manager, Master Scheduler, Production Scheduler, Material Planner availability – Go live within the May 10 th – July 12 th time period
28
QAD Proprietary QAD Demo Center MSW and PSW Tuesday, March 23 rd : 8:30 – 11:30am Step through specific business scenarios You ask, we show Come talk to us!
29
QAD Proprietary Contact Information Carianne Nieuwstraten E-mail: czn@qad.comczn@qad.com Phone: 503-236-0025 Brent Shooltz E-mail: bws@qad.combws@qad.com Phone: 616-285-6617