Download presentation
Presentation is loading. Please wait.
1
SeisUP ® GeoCenter, Inc. Training ~ 2003
2
(left click on SeisUP window)
Initial SeisUP window when beginning. (left click on SeisUP window)
3
When re-entering each SeisUP session, each assigned user will always return to the it’s last AREA and LINE location.
9
Data Manager (next slide)
10
Data Manager
12
Job Monitor (next slide)
17
“Right Click” on each SeisUP module enables additional options.
19
Creating a “New” Area or Line
20
THESE ARE CRITICAL OPTIONS PLEASE SELECT ACCORDINGLY
NOTE: THESE ARE CRITICAL OPTIONS PLEASE SELECT ACCORDINGLY (example: 2D data measured in meters) Select Options and Identify prospect name and locations.
21
THESE ARE CRITICAL OPTIONS PLEASE SELECT ACCORDINGLY
NOTE: THESE ARE CRITICAL OPTIONS PLEASE SELECT ACCORDINGLY (example: 3D data measured in feet) Select Options and Identify prospect name and locations.
23
Importing a new “Data Set” “Select Path” location of data
Give Name Select options “Select Path” location of data
25
“Building a Job Queue” Open the Module Librarian Select “INPUT AND OUPUT” category “Left Click” mouse on “SEGYREAD” “SEGYREAD” is automatically connected and highlight for further SeisUP processing modules
26
“Writing to Disc” Select “INPUT AND OUPUT” category “Left Click” mouse on “WRITE” “WRITE” is automatically connected and opens window for disc name and compression options.
27
“Running a Job” Hold left mouse and drag across the desired modules to be run. And release, the intended modules to be run will be highlighted. “Left Click” mouse on the “running man” icon Job will indicate it is running if sensor is yellow. Green will indicate it is complete and Red will indicate that the job has ended prematurely.
28
“Running Job’s in Batch Mode”
“Left Click” mouse on the “3-Standing men” icon Job will indicate it is running if sensor is yellow. Green will indicate it is complete and Red will indicate that the job has ended prematurely. For second Job in Batch Mode. Highlight second job and “Left Click” mouse on the “3-Standing men” icon. This job will begin after first batch run is complete. **** PLEASE NOTE IF THE PREVIOUS JOB ENDS ABNORMALLY AND SENSOR IS RED THE SECON BATCH JOB WIOLL NOT BEGIN. Batch Run #1 Batch Run #2
29
“Adding Additional Job’s”
Continue to add to data disc file, using same criteria as before and adding additional modules as required. Run jobs interactively or in batch. There is no limit to the number of jobs running from the same disc. Data Disc File”
33
ADDITIONAL OPTIONS WHILE IN DISPLAY
34
E-mail: wzepeda@geocenter.com
This presentation is preliminary example of SeisUP – there will be additional presentations offered in the near future. We welcome any suggestions that you may have, and any request for specific tutorials that may be of help. Hope you find SeisUP ® to be an intricate part of your seismic processing necessities. Thank You William E. Zepeda Custom Support