STATUS 11/8/15 Itamar, Meny, Sacha, Yan
4
Envelope gluing : – All pieces has been produced – Yesterday, a robust pump has been installed – First gluing tests have been done today. Everything seems ok Two new sensors production – Preparation of fan out (soldering of connectors)
5
Laser soldering Fan out kapton and part of broken sensor have been sent to the company We just got a mail this morning saying that they have received it and starting to sold with the laser News in few days …
6
Readout options HardwarePhysics studyModification needed Missing parts mechanics Plan A VMM2 + SRS Achieve all objectives NoAlmost everything No major problem Plan BAPV + SRSDue to limited ADC/fixed gain only beginning of the shower is accessible noSome partsSimilar at plan A Plan CStandard electronic Only 32 channels per plane Adaptor panasonic to FEB Adaptor board to produce Need to be discussed with WK
7
Option C W W beam Thin sensor Standard FEB Adaptor board Flexible kapton FSH- 145-04-L-RA-SL 90 pins connector AXK5SA3277YG Panasonic connector Next slide view
8
1 2 3 4 5 6 7 8 9 90 10 35 36 37 38 39 40 69 7068 67 HVNCGND SIGNAL GND HV HV connector130 pin Panasonic connector gnd 1 2 15 16 17 18 31 32 resistance ADAPTOR BOARD (SIDE WITH THE PANASONIC CONNECTOR)