Download presentation
Presentation is loading. Please wait.
Published bySilas Myron Bradford Modified over 9 years ago
1
Missoula Long Range Transportation Plan 11 December 2008 Open House
2
Tomorrow’s roads, transit lines, bike and pedestrian improvements are born here Many millions of dollars will be spent in the next few decades to keep Missoula mobile These investments will follow the Missoula Long Range transportation plan
3
About the Transportation Plan Federal Government requires a long range transportation plan be conducted by a designated metropolitan planning organization (MPO) Missoula's MPO is guided by the Transportation Policy Coordinating Committee
4
TPCC BILL CAREYBoard of County Commissioners ALEX TAFT Missoula Urban Trans. District (MUTD) JOHN ENGENMayor, City of Missoula STACY RYECity Council LARRY ANDERSONBoard of County Commissioners DOUG MOELLERMontana Department of Transportation (MDT-Missoula) DON MACARTHURMissoula Consolidated Planning Board LLOYD RUEFederal Highway Administration KATHLEEN DRISCOLLRavalli County Commissioner DR. GARON SMITHMissoula City/County Health Board
5
Tonight’s Presentation Key Plan Ingredients –Envision Missoula Scenarios –UFDA and Missoula’s Future –Summit & Surveys –Agency Input Plan Goals and Objectives Costs, Revenues and Constraints Projects
6
Gathering Plan Ingredients Transportation Goals Anticipated Costs and Revenues List of Projects Decision
7
Gathering Plan Ingredients Transportation Goals Anticipated Costs and Revenues List of Projects Decision
8
Planning for 2035 Envision Missoula 3 Scenarios for Visioning Workshops were used in Missoula’s Urban Fringe Development Area Study (UFDA) UFDA Defines future development assumptions and affects accruing transportation needs –Programmatic (Modal) Allocations –Nominated Projects (Needs Vs. Wants)
9
Envision Missoula Scenarios Scenario A: Business As Usual –Extend today’s housing trends into the future Scenario B: Suburban Satellites –Growth happens in accessible mixed use town centers Scenario C – Focus Inward –Compact growth occurs contiguously and compactly near central Missoula –Downtown intensifies by building on parking lots and low value commercial sites
10
Urban Fringe Development Area Study (UFDA) Considerations for UFDA 2035 Planning Scenario Open House Comments Agency Comments Community Goals based on the Growth Policy Existing Zoning Constrained Lands Entitled Lots Infrastructure investment Suitability Analysis
11
Where the Trips Will Be High Concentrations of New Trips Downtown In Selected Centers Consistent with Envision Missoula These patterns do not change today’s needs or “Backlog” Location of Future Trips Frames Assessment of Potential Accruing LRTP Projects
12
If County follows UFDA future travel needs are mitigated Even with UFDA, many roads exceed capacity if based on today’s committed projects
13
Planning Summit February & March 2008 Vision Scenarios Presented Public Input Taken About key LRTP and UFDA Issues Including: –Development Choices –Modal Balance –Transportation Investments
14
Development Preferences Encourage town centers Focus growth inward Encourage growth downtown Allow more attached and multi-unit homes Encourage development near public transportation
15
Transportation Mode Preferences Public input supports a balance of roadway and non-roadway projects Majority of people use a non-auto mode at least once a week The most desirable transit features are short wait times and frequent service
16
Transportation Investment Preferences Desire to add more transportation options on existing infrastructure Desire for increased investment in transit Prefer a network approach (many small streets) rather than just a few large trunk lines.
17
Public Survey Summary
18
Summit Participation
19
Points of Consistency Among the Public Summit –27 Percent Favor Expanding Roadway Capacity –23 Percent Favor Modernizing Existing Infrastructure (intersection/safety/IT S type improvements) Survey –28.6 Percent Favor Expanding Roadwy Capacity –21.2 Pecent favor improvemetns aimed at Safety (auto, bike, pedestrian)
20
Agency Input Montana Department of Transportation (MDT) City of Missoula Missoula County Mountain Line Transit Safety Agencies Resource Agencies Security Agencies MRTMA
21
Gathering Plan Ingredients Transportation Goals Anticipated Costs and Revenues List of Projects Decision
22
Plan Goal Areas Safety –Higher Rank at High Crash Location –Higher Rank for “Vulnerable Connections (transit, bicycle, pedestrian) Multi-Modalism –Complete Streets –Expanded Options (trails, new routes) –Increased Transit Funding –Increased Enhancements and Bicycle/Pedestrian Funding
23
Plan Goal Areas (Contd) System Preservation –Limit Roadway Expansion Investment, Manage Maintenance Costs Demand Management –Utilize UFDA to manage number and length of trips/demands on the system –Do not use roadway expansion to open new land for development –Invest in Collectors, not development along arterials Transit Accessibility –Coordinate new job centers around public transportation
24
Supporting Policies Missoula Greater Downtown Master Plan
25
Gathering Plan Ingredients Transportation Goals Anticipated Costs and Revenues List of Projects Decision
26
From Goals to Investments Project Ideas are Unlimited but Funds Are Limited –$1.1 Billion in projects have been suggested by state and local transportation agencies –$400 Million in projected revenues are available UFDA, Visioning, Modeling and Geographic Development Patterns defined geographic “Needs” vs. Wants Survey Results LRTP Goals and Ranking Criteria determined which needs are to be funded
27
Gathering Plan Ingredients Transportation Goals Anticipated Costs and Revenues List of Projects Decision
28
How the Project list was developed Projects submitted by: –Montana Department of Transportation (MDT) –City of Missoula –Missoula Urban Transportation District (Mountain Line) –Missoula County –Missoula Redevelopment Authority –Missoula-Ravalli Transportation Management Association (MRTMA)
29
How the Project list was developed Broad list of projects scored based on ranking criteria derived from: –Public Survey –Public Workshops and Missoula Planning Summit Assumes Growth occurs consistent with UFDA 2035 Development Projection
30
Project Map
31
Backlog projects
32
Recommended (funding anticipated in the next 30 years)
33
Illustrative
35
Summary Key Plan Ingredients –Envision Missoula Scenarios –UFDA and Missoula’s Future –Summit & Surveys –Agency Input Plan Goals and Objectives Costs, Revenues and Constraints Projects
36
Missoula Long Range Transportation Plan 11 December 2008 Open House
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.