1 ESET ALEMU WEST Consultants, Inc. Bellevue, Washington

2  Purpose for DSS  Project Area Description  Construction Steps  Experimental Design  Results and Implications Presentation Outline

3  Construct a system that represents the physical configuration and operational aspects of a of the Jackson Hydropower Project  System wide management tool used for identifying and evaluating operation alternatives in a multipurpose system  Provide a basis for effecting a collective understanding between the different departments involved with managing the project  Demonstrate the value of forecasts oHydrologic Forecasts (Ensemble Streamflow) oEnergy Price Forecasts  Demonstrate the time of year (season) when forecasts are the most valuable Purpose of DSS

4 Project Description

5 ▶ The project is located on the Sultan River which drains into the Skykomish River in the Snohomish River Drainage ▶ The system is fed by snowmelt and is characterized by a double humped peak in the fall and spring ▶ It is operated for water supply, flow regulation and hydroelectric power generation ▶ It provides the city of Everett with water supply and about 8% of its electricity ▶ Spada Lake has a storage of 153,000 acre feet while Lake Chaplin has about 18,000 acre feet of storage Project Description

6

7  Instream flow requirements are enforced at different segments of the Sultan River and take precedence over hydropower generation.  Project is operated based on a July-June water year in four different zones.  Operations target to maintain the pool within State 3 Project Description

8 Operational Models Components of a Decision Support System Simulation ModelOptimization Model Forecast Generation and Integration Evaluation of Values of Forecasts Real-Time Operation Support Construction Steps

9 Operational Models  Built with GoldSim simulation software  Captures system operations at the project with hydraulic formula and conditional statements  Inputs streamflow and energy prices time-series, instream flow requirements and starting pool elevations  Runs on a daily timestep to represent real-time operations of reservoir releases, environmental flow requirements, routing priorities  Used to set operational guidelines for optimization model Simulation Model

10

11 Operational Models Optimization Model  Built with Lingo linear programming language  Captures the hydraulic and operational elements of the system in a mathematical framework  Input variables are forecasts of streamflow and energy prices  Decision variables used are power tunnel releases, timing of releases  Calculates the quantity and timing of reservoir releases that maximizes energy production  Optimizes system operations within 60 days  Uses simulation model output for monthly storage targets and hydraulic capacities as constraints

12 Forecast Generation  Produced using Ensemble Streamflow Prediction (ESP) method  Generated by running a hydrological model (DHSVM) with historical meteorological data of the Sultan River Basin  Model is run with using observed precip and temp from the first 7 days and climatology for the following days  Produces streamflow traces that have equal probability of occurring  Captures the high daily variation in actual streamflow  Produced for a period of two months and updated weekly Retrospective Streamflow Forecasts

13 Forecast Generation  Generated using historic daily spot prices from the mid-Columbia energy market  Produce weekly averages of recent (2008-09) 60-day forecasts of daily spot prices  Calculate the average weekly error between the weekly averages and actual spot prices  Apply average weekly error by forecast lead time to historic spot prices for the years evaluated (2001-04)  Disaggregate synthesized weekly forecasts to a daily time-step Retrospective Energy Price Forecasts

14  Impacts of each forecast on reservoir operations Streamflow forecasts quantity of water released for energy production Energy Price forecasts timing of releases to capture energy price peaks  Evaluation of the value of individual and combined forecasts 1.Forecasted Energy Prices + Actual Streamflow 2.Forecasted Streamflow + Actual Energy Prices 3.Forecasted Energy Prices + Forecasted Streamflow 4.Actual Energy Prices + Actual Streamflow Forecasts Integration of Forecasts

15 Simulation modelOptimization model Energy Price Forecasts Retrospective 60 day Forecast Input Monthly Reservoir storages Updated weekly reservoir storages Derive weekly operations Update system weekly with observed streamflow Framework for operating the models Activated by Change in Week Streamflow Forecasts

16 Evaluation of Values of Forecasts  Investigations are conducted for three years representing a range of hydrological conditions  Simulations based on Rule Curves used as baselines for measuring the improvement of reservoir operations  Reservoir operations are improved though refining  Quantity of releases  Timing of releases  Metrics used for quantifying the improvement in skill in operation  Cumulative revenue generated  Quantity of energy produced

17 Revenue Generated from Integration of Forecasts Values of Forecasts

18  Assess the value of forecasts in periods of pre-specified operational procedures  Review the range of optimal operation policies based on an ensemble streamflow traces  Calculate probabilities of elevation targets in drawdown/ refill periods Evaluation of Values of Forecasts

19 Ensemble Forecasts at Summer Drawdown

20 Ensemble Forecasts at Spring Refill

21 Real-Time Operation Support 1.Obtain the streamflows forecasts for next 60 days from a data center (RFC/other government agencies) 2.Select ensemble streamflow forecasts to be used 3.Run a combination of simulation and optimization model 4.Record the ensemble optimal releases for individual forecasts 5.Evaluate the mean, median and distribution of releases 6.Consider other factors such as state of the snowpack and energy market and other operational factors to make an informed decision Monday Morning-Decision Making

22  There are significant economic benefits to be gained from effectively incorporating forecasts.  Reservoir operations can be improved with use of forecast information.  Simulation model provides insight into the probabilistic range of historical reservoir storages based on current rule curves.  DSS supplements the overall management process of making operating decisions for a multipurpose project.

23 Questions