Download presentation
Presentation is loading. Please wait.
Published byTerence Barrett Modified over 9 years ago
1
http://www.aialogistics.com
2
AIA LOGISTICS Modern Facility on Bang Na – Trad km 19 Strategic Location Airport ICD Industrial Estate Space 5,000 sqm GMP Compliance Go-Live: Oct 2012 AIA Logistics Co.,Ltd. National Logistic Center
3
AIA LOGISTICS Strategic Location International Airport Inland Container Depot, Ladkrabang Industrial Estate. East Bangkok Space 5,000 sqm Proximity in Business Model Bangna-Trad Rd.200 m. Airport 20 km 25 mins ICD, Ladkrabang 27 km 30 mins BKK Port 45 km 60 mins Laem chabang port 80 km 120 mins Facility National Logistics Center-Bangna km19
4
AIA LOGISTICS Space Allocation Storage Racking storage 4980 sqm No. of row 26 row No. of Pallet4992 Pallet Bulk storage 200 sqm Staging Area Inbound Staging 360 sqm Outbound Staging 360 sqm Others Office 300 sqm Battery Room 70 sqm Facility Overview Warehouse Layout @ Bang Na Trad Km 19
5
AIA LOGISTICS Facility Specifications Total Space4,958 SQM Clear Operation Height10.00 Meters Floor Loads3 Tons/SQM Smoke DetectorIncluded Sprinkler SystemNone (Meet Laws standard requirement) Security SystemCCTV and Guard 24 hr. Dock Door 2 Units Dock Leveler 3 Units Raised Floor 1.30 Meters Available 1st October 2012 Facility Warehouse building and Layout
6
AIA LOGISTICS Brand New Facility at Bang Na – Trad KM 19 -Need very high standard WH Discharge or loading cargo at Air Port or Ladkrabang ICD Located on Bangna-Trad area FMCG, Automotive, Food & Drug Go live Oct 2012 Current show case
7
AIA LOGISTICS NLC Operation Material Handling Equipment @ Bang Na Trad Km 19 Handling Equipment Equipment TypePictureNo. of UnitComment / Brief Description Forklift Truck3load capacity 1.5 t, max. fork height capacity 4.5 m turning radius ca. 3.5 m Reach Truck3fork load capacity 1.5 t, max. fork height capacity 8.5 m Hand Pallet Truck92.2-2.5 ton load Wooden PalletsN/A1.0 X 1.2 m
8
AIA LOGISTICS Temporary Tent Co-Pack 500 SQM Warehouse Layout Co-Pack and Storage Allocation Co-Pack area 300 SQM IN&OUT Staging 300 SQM Space Allocation Storage Racking storage No. of row 5 row No. of Pallet1,000 Pallet Working Area Co-pack 800 sqm In&Out Staging 300 sqm Others Office 150 sqm
9
AIA LOGISTICS Team Organization PositionQTY Warehouse Manager1 Inventory, QA, Safety, Continuous Improvement Manager 0.5 WMS Superuser0.5 Customer Service1 Warehouse Supervisor1 Reach Truck & Forklift Drivers2 Checker3 Picker2 Worker & VAS49 Total60
10
AIA LOGISTICS Co-Pack Operation Co-Pack Line 7 Co-Pack Line 7 Staff / Line Productivity 20 Baskets / Line / Hour 150 Basket / Line / Day 1,050 Basket / Day 25,000 Basket / Month Table RM1 Basket RM2 RM3 RM4 RM5 Carton FG Packer 1 Packer 2 Basket prepare RM Prepare Packer 3 Labeling & Wrapping Carton Packing
11
AIA LOGISTICS Process Description (Inbound Flows)
12
AIA LOGISTICS Process Description (Putaway Flows)
13
AIA LOGISTICS Warehousing Efficiency Ciel FW Inbound Flow
14
AIA LOGISTICS Process Description (Picking Flows)
15
AIA LOGISTICS Process Description (Packing & Outbound Flows)
16
AIA LOGISTICS Warehousing Efficiency Ciel FW Outbound Flow
17
AIA LOGISTICS Warehousing Efficiency Ciel FW Outbound Flow
18
AIA LOGISTICS Warehousing Efficiency Ciel FW Inventory Management
19
AIA LOGISTICS Co-pack experience project
20
AIA LOGISTICS
21
AIA LOGISTICS
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.