Presentation is loading. Please wait.

Presentation is loading. Please wait.

Obtaining and Laying Out Operating Facilities

Similar presentations


Presentation on theme: "Obtaining and Laying Out Operating Facilities"— Presentation transcript:

1 Obtaining and Laying Out Operating Facilities
Chapter 11 Obtaining and Laying Out Operating Facilities Functions Of Operating System Choosing The Right Location Planning Physical Facilities Role Of Telecommuting Using Standards To Improve Operations

2 Elements Of Operating System
System For Changing Form Place Time Sequence For Inputs > Outputs Skills, Tools, Machines For Change Instructions/Goods Identification Time Frame For Completion McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved.

3 Operating System Inputs Processes Outputs

4 Operating Systems

5 Operations/Production
“…converting inputs into outputs for customers.”

6 Producing A Whopper

7 Burger King Systems Marketing Production Delivery
John A. Rizzo/Getty Images

8 Beginning Operations Choose Right Location Plan Facilities
Decide On Layout Implement Plans

9 Types Of Locations Retailer- Sells Goods To Consumer
Producer- Converts Large Volume Of Materials Into Products For Others To Sell Service Company- Provides Service To Customer Retailer or producer? Royalty-Free/CORBIS

10 Location Factors- General
Access To Work Force Availability Of Supplies & Services Availability Of Transportation Taxes/Regulations Availability Of Utilities Scenics of America/PhotoLink/Getty Images

11 Retailer Location Factors- Specific
Trade Area Population Trends Purchasing Power Trade Potential Competition Shopping Centers Janis Christie/Getty Images

12 Some Eclips

13 Producer Location Factors- Specific
Market Location Vendor Location Labor Availability Transportation Utilities Government/Taxes Schools/Recreation

14 Site Selection Rating Sheet

15 Types Of Stores Convenience Shopping Specialty Royalty-Free/CORBIS

16 Types Of Locations Downtown Business District Freestanding Stores
Shopping Centers Designed To Draw Traffic Anchor Stores Royalty-Free/CORBIS

17 Calculating Total Rent
Some add 5-7% of gross over $x Source For Determining Average Cost Per Square Foot In Your City-

18 Planning Physical Facilities
Determine Product Identify Operations/Activities Determine Space Needs Decide On Best Layout Keith Brofsky/Getty Images

19 Layout Example

20 Layout Type Product or Process General Final Implement

21 Issues About Production Layout
Space For Movement Utilities Safety Working Conditions Cleanliness Product Quality Aesthetics Ryan McVay/Getty Images

22 Reasons To Telecommute
Flexible Hours Save On Clothes Save On Dry-Cleaning Save On Parking Save Commute Time Avoid Office Politics Not Micro-Managed Time With Family More Productive Helping Environment Source: PageWise,

23 Telecommuting Considerations
Access To Technology Get Best Technology Shipping Methods Supplies Source Year-Round Weather Transportation Contingency Plans Telecommuting Aptitude Test- Javier Pierini/Getty Images

24 Steps To Telecommuting
Determine Whether Telecommuting is Right For You Develop A Plan Talk To Manager Get Needed Training/Equipment Start Telecommuting Ryan McVay/Getty Images Source: CNNMONEY, “Telecommuting: the pitch, Sept. 21, 1999,

25 Improving Operations State Problem Collect/Record Information
Develop/Analyze Alternatives Select/Install/Follow Up Set/Use Performance Standards TRBfoto/Getty Images


Download ppt "Obtaining and Laying Out Operating Facilities"

Similar presentations


Ads by Google