GridSolar, LLC The GridSolar Project – A Different Vision for our Nation’s Electric Grid Presentation – NASUCA June 15, 2010 Richard Silkman, Ph.D. - Founding Partner
2
2 Maine’s Energy Choice CMP Vision in which peak load is met by large generating facilities located far from load requiring expensive transmission systems GridSolar Vision in which peak load is met through a smart electric grid using small-scale distributed solar generation located close to load
3
3 CMP MPRP
4
4 MPRP – Proposed Solution
5
5 MPRP - Out-of-Date Vision of the Electric Grid Very large Generation Stations WERE the most efficient forms of generation
6
6 MPRP - Out-of-Date Vision of the Electric Grid Manufacturing – that WAS best served by Large Central Generation Stations
7
7 MPRP - Out-of-Date Vision of the Electric Grid Transmission WAS easy to site and permit
8
8 MPRP - Out-of-Date Vision of the Electric Grid Information WAS difficult to obtain and process
9
9 GridSolar Offers a Different Vision of the Electric Grid Load growth is weather sensitive
10
10 GridSolar Offers a Different Vision of the Electric Grid Generation placed near the load
11
11 MPRP - Out-of-Date Vision of the Electric Grid Transmission is NOT easy to site and permit
12
12 GridSolar Offers a Different Vision of the Electric Grid Information is easier to manage
13
13 GridSolar Vision
14
14 GridSolar Vision Grid Interconnection Equipment for Distributed Solar Systems
15
15 GridSolar Project Install distributed solar generation to meet actual (not projected) peak loads When solar will not meet peak loads: Install propane/natural gas fired distributed generation in dual role of back- up generation plus grid-tied generation Demand-response using interruptible loads Battery backup as the technology improves
16
16 Solar is the only renewable resource that is coincident with peak loads
17
17 Will GridSolar Work YES - the ability of the GridSolar Project to ensure grid reliability is acknowledged by CMP. In addition: less costly better job opportunities less risky less impact on the environment
18
18 GridSolar will Cost Ratepayers Less Money than the MPRP
19
19 Costs of Solar PV are Falling Solar Cost Curve is expected to decline over the next 20 years due to technological improvements, manufacturing scale and new production methods
20
20 Smart Electric Grid
21
21 GridSolar – Next Steps Maine – Stipulation Work with Utility to develop smart grid plan and platform plus 2 or 3 pilot projects in Maine for implementation Elsewhere Identify opportunities to work with consumer advocates in other states to support the GridSolar Project as a Non- Transmission Alternative to peak load growth and ensuring grid reliability
22
GridSolar, LLC Contact Information www.gridsolar.com (207) 772-6190