2 Project History Overview  Exploration well drilled in 1997 when site was under State ownership  State accepted original reclamation efforts  Land ownership was transferred to Grand Staircase-Escalante National Monument in 1999  ConocoPhillips continued reclamation of the five acre site by seeding in 2002, monitoring in 2003, and replanting in 2004.

3 Location information  45 miles southeast of Escalante, UT  Located in remote area of the Kaiparowits Plateau  Area contains network of canyons with steep slopes and sandstone ledges  Surrounding vegetation is pinyon- juniper interspersed with sagebrush shrubland

4 Reese Canyon Setting

5 Original Reclamation Efforts – Phase 1 Site was regraded and seeded in 1997 with limited success Native, BLM approved seed mix was used Dark soils and south facing slopes presented challenges to restoration of the site

6 Phase 2 Reclamation  Maxim Technologies contracted in 2002 to reseed site with mix of native shrubs, forbs, and grasses  Site was mulched for moisture retention  Baseline vegetation studies implemented to track project success  Moderate success due to drought conditions

7 Phase 2 Reclamation

8 Phase 2 Reclamation – Vegetation Studies

9 Phase 3 Reclamation  ATC Associates contracted in 2004 to conduct further reclamation  Continued vegetation monitoring  Innovative strategies such as pocket planting implemented  Small and large woody debris added to site to retain soil moisture and slow erosion

10 Phase 3 Reclamation – Pocket Plantings Pocket plantings

11 Phase 3 Reclamation – Palmer penstemon

12 Phase 3 Reclamation

13

14 Phase 4 Reclamation – 2005 Activities  ConocoPhillips/ATC Associates will conduct a reconnaissance trip this spring to determine extent of any erosion  Erosion control structures will be implemented as needed  Russian thistle seedlings will be removed  Annual vegetation monitoring data will be collected

15 Award Justification  Continued commitment to reclamation of site regardless of state approval  Use of innovative techniques to achieve reclamation success  Establishment and seed production of native species on a site with poor growing conditions