Download presentation
Presentation is loading. Please wait.
Published byAustin Lawson Modified over 9 years ago
1
THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System
2
THE FOSTER GROUP TFGTFG 10/10/2015 Page 2 DWSD CIP Statistics – Sewage Disposal System During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The updated July 2009 5-year CIP anticipates the need for just over $1.0 billion (~$200 million annually) The updated July 2009 5-year CIP anticipates the need for just over $1.0 billion (~$200 million annually)
3
THE FOSTER GROUP TFGTFG 10/10/2015 Page 3 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)
4
THE FOSTER GROUP TFGTFG 10/10/2015 Page 4 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)
5
THE FOSTER GROUP TFGTFG 10/10/2015 Page 5 Capital Improvement Program – Sewage Disposal System Criteria in Report Criteria in Report Primary Project Purpose Primary Project Purpose 1 – Directly Mandated for Regulatory Compliance 2 – Necessary for Regulatory Compliance Mandates 3 – System Reliability 4 - Technological Advance / Efficiency 5 – New Service Areas Allocation Status Allocation Status D - Detroit Only S - Suburban Only M - Macomb Only C/O - Clinton/Oakland Only C/O & Mac - Clinton Oakland and Macomb 83/17 - New Wet Weather Facilities CTA - Common to all
6
THE FOSTER GROUP TFGTFG 10/10/2015 Page 6 Sewage Disposal System CIP - FUNDED Financing Requirement Summary
7
THE FOSTER GROUP TFGTFG 10/10/2015 Page 7 Sewage Disposal System CIP - FUNDED Financing Requirement Summary
8
THE FOSTER GROUP TFGTFG 10/10/2015 Page 8 Sewage Disposal System CIP Comparison July 2009 vs. July 2008– ($ millions)
9
THE FOSTER GROUP TFGTFG 10/10/2015 Page 9 DWSD CIP Observations – Sewage Disposal System Dramatic reductions in every year Dramatic reductions in every year 2-year Funding Window: 2-year Funding Window: 45% of Prior CIP 45% of Prior CIP Reflects reduction of almost $500 million Reflects reduction of almost $500 million Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Upper Rouge Tunnel ($337 million short term reduction) Upper Rouge Tunnel ($337 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction)
10
THE FOSTER GROUP TFGTFG 10/10/2015 Page 10 DWSD CIP Observations – Sewage Disposal System Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) $186 million reduction ($26 million in Funding Range) $186 million reduction ($26 million in Funding Range) Added Long Term Incinerator Improvements Added Long Term Incinerator Improvements $130 million addition ($2 million in Funding Range) $130 million addition ($2 million in Funding Range) Addresses cancellation of Synagro Contract Addresses cancellation of Synagro Contract Other moderate deferrals to match construction schedules Other moderate deferrals to match construction schedules
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.