Presentation is loading. Please wait.

Presentation is loading. Please wait.

The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.

Similar presentations


Presentation on theme: "The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005."— Presentation transcript:

1 The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

2 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 2 FRANCE - CNRS ESPCI – Paris IPN – Lyon LAL – Orsay LAPP – Annecy OCA - Nice ITALY - INFN Firenze-Urbino Frascati Napoli Perugia Pisa Roma Inaugurated July 2003

3 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 3 Sensitivity Goal seismic thermal shot LIGO First attempt to extend the detection band down to a few Hz!

4 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 4 Thermal noise The superattenuator Measured Upper Limit

5 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 5 A short summary  July 2003: Inauguration. Start of full detector commissioning  February 2004: first lock in “recombined” mode (Michelson+FP)  October 2004: first lock in “recycled” mode  September 2005: inspiral range for NS/NS >1 Mpc Autumn 2003: single cavity Feb. 2004: recombined Oct. 2004: recycled

6 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 6 Inspiral range for NS/NS  30 kpc Nov 03 Dec 04

7 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 7 ITF bistability  Jan-May 05: commissioning slowed down by ‘jumps’  Physical origin not fully understood. Solved after work on alignment, locking, detection ITF power (W) Time (s)

8 C6 and before (June-July 05)

9 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 9  Some ITF adjustments (injection bench alignment, tuning of demodulation phases, photodiode centering) allowed to get rid of the ‘jumps’  ITF stability improved by implementing angular drift control using wavefront sensing  Low frequency control noise reduced by improving the locking driving matrix  Locking procedure fully automated 15 days run (29 July – 12 August) Remarkable improvement in sensitivity and stability

10 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 10 C6 sensitivity

11 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 11 051014 days Recycling cavity power C6 stability Duration: 336h Locking: 89.3% Science mode: 86.2% Longest lock stretch: 40 hours!

12 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 12 C6 inspiral range 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) Best range: 0.4 Mpc Inspiral range for NS/NS: optimal orientation Stray beam dumping on end benches Power stab loop improvement

13 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 13 C6 noise budget Noise fully understood. Main contributions: –Length/angular control noise –Actuation (DAC) noise –Frequency noise

14 After C6 (mid Aug-mid Sep 05)

15 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 15 Actions after C6  Control noise reduction: –Autoalignment fully implemented! –Better length control noise rejection –Increase of modulation depth  DAC noise reduction –Full hierarchical control implemented (actuation over 3 stages) –Low gain/noise coil driver  Frequency noise reduction –More power on the photodiode providing the error signal Important achievements: Anderson technique demonstrated SA control design demonstrated ITF left locked during night !

16 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 16 Autoalignment

17 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 17 Pick-up of Sideband power Automatic alignment of NE mirror using wavefront sensing of output dark-fringe: NO, YES DC output power before the output mode cleaner Pick-up of power recycling cavity power DC output power after the output mode cleaner AA effect on ITF signals

18 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 18  Limited dynamic range requires to split forces over more control stages  Reducing the force on the mirror allows to reduce actuation noise Hierarchical Control DC-0.01 Hz 0.01-5 Hz 5-50 Hz 10 mN Force applied to the mirror (a.u.) without hierarchical control Force applied to the mirror with hierarchical control (same a.u.) with tidal control & re-allocation to the marionette 1 mN IP displacement

19 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 19 zCorr reduction  Marionette/RM crossover @5 Hz  After reallocation zCorr rms reduced by  100  Allows switching to low noise coil driver (talk by A.Gennai) Without marionette 700 nm rms With marionette 7 nm rms

20 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 20 Automation

21 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 21 Automation  Lock Acq procedure fully automated 5 mins Lock to DF variable finesse AA ON OMC lock Marionette Low noise CD  technique Lines ON

22 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 22 C7 run  Many new features implemented, good sensitivity improvement  NS/NS inspiral range beyond Andromeda  New run decided before ITF scheduled shutdown  C7: 14-19 September

23 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 23 C7 vs C6 sensitivity

24 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 24 C7 duty cycle  Too many improvements in a short  A couple of stormy days duty cycle worse than C6 …though still good Locked: 70% Science mode: 64%

25 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 25 C7 inspiral range Best range: 1.65 Mpc for NS/NS, 8.6 Mpc for BH/BH

26 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 26 C6 C7 Mpc

27 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 27 DA commissioning  Two online analysis for chirp detection running  NS/NS events injected September 19 September 15 Injected events 1.2-1.6 S.M. Grid 1-3 S.M. Grid

28 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 28

29 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 29

30 Virgo upgrades (Oct-Dec 2005)

31 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 31 Problems with injection system  A small fraction (bigger than expected) of the light reflected by the interferometer is retro-diffused by the input mode cleaner mirror: spurious interference  Temporary solution: reduce the power (/10). Virgo has been working with P in =0.7 W  Final solution: install a Faraday isolator A new injection bench is needed. Frequency noiseRecycling mirror: - aligned - not aligned

32 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 32 Injection bench upgrade  New bench: –Larger surface available for optics mounting –Higher rigidity –New wires  Faraday isolator TGG (Terbium Gallium Garnet) produced by EOTec: –Compliant with 20 W laser –40 dB isolation measured Brewster dielectric polarizers Rotator

33 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 33 PR mirror: curved and compound –Nasty internal resonances, very annoying for the locking –Misalignments and jitter induced by translation To be replaced with a standard flat Virgo mirror PR transfer function PR mirror replacement

34 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 34 Progress summary

35 Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 35 2006 plan Get close to DESIGN SENSITIVITY Make a SCIENCE RUN


Download ppt "The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005."

Similar presentations


Ads by Google