Download presentation
Presentation is loading. Please wait.
Published byGrant Strickland Modified over 9 years ago
1
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005
2
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 2 FRANCE - CNRS ESPCI – Paris IPN – Lyon LAL – Orsay LAPP – Annecy OCA - Nice ITALY - INFN Firenze-Urbino Frascati Napoli Perugia Pisa Roma Inaugurated July 2003
3
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 3 Sensitivity Goal seismic thermal shot LIGO First attempt to extend the detection band down to a few Hz!
4
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 4 Thermal noise The superattenuator Measured Upper Limit
5
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 5 A short summary July 2003: Inauguration. Start of full detector commissioning February 2004: first lock in “recombined” mode (Michelson+FP) October 2004: first lock in “recycled” mode September 2005: inspiral range for NS/NS >1 Mpc Autumn 2003: single cavity Feb. 2004: recombined Oct. 2004: recycled
6
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 6 Inspiral range for NS/NS 30 kpc Nov 03 Dec 04
7
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 7 ITF bistability Jan-May 05: commissioning slowed down by ‘jumps’ Physical origin not fully understood. Solved after work on alignment, locking, detection ITF power (W) Time (s)
8
C6 and before (June-July 05)
9
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 9 Some ITF adjustments (injection bench alignment, tuning of demodulation phases, photodiode centering) allowed to get rid of the ‘jumps’ ITF stability improved by implementing angular drift control using wavefront sensing Low frequency control noise reduced by improving the locking driving matrix Locking procedure fully automated 15 days run (29 July – 12 August) Remarkable improvement in sensitivity and stability
10
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 10 C6 sensitivity
11
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 11 051014 days Recycling cavity power C6 stability Duration: 336h Locking: 89.3% Science mode: 86.2% Longest lock stretch: 40 hours!
12
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 12 C6 inspiral range 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) 04/08(15:00 LT): spurious beams damped on NE bench 04/08(15:00 LT): spurious beams damped on NE bench 10/08 (14:00LT): laser beam re-aligned on the IMC 10/08 (14:00LT): laser beam re-aligned on the IMC 11/08 (15:30LT): laser power stabilization reconfigured 11/08 (15:30LT): laser power stabilization reconfigured GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) GPS: 807818236 ( 297kPc) GPS: 807842186 ( 300kPc) Best range: 0.4 Mpc Inspiral range for NS/NS: optimal orientation Stray beam dumping on end benches Power stab loop improvement
13
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 13 C6 noise budget Noise fully understood. Main contributions: –Length/angular control noise –Actuation (DAC) noise –Frequency noise
14
After C6 (mid Aug-mid Sep 05)
15
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 15 Actions after C6 Control noise reduction: –Autoalignment fully implemented! –Better length control noise rejection –Increase of modulation depth DAC noise reduction –Full hierarchical control implemented (actuation over 3 stages) –Low gain/noise coil driver Frequency noise reduction –More power on the photodiode providing the error signal Important achievements: Anderson technique demonstrated SA control design demonstrated ITF left locked during night !
16
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 16 Autoalignment
17
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 17 Pick-up of Sideband power Automatic alignment of NE mirror using wavefront sensing of output dark-fringe: NO, YES DC output power before the output mode cleaner Pick-up of power recycling cavity power DC output power after the output mode cleaner AA effect on ITF signals
18
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 18 Limited dynamic range requires to split forces over more control stages Reducing the force on the mirror allows to reduce actuation noise Hierarchical Control DC-0.01 Hz 0.01-5 Hz 5-50 Hz 10 mN Force applied to the mirror (a.u.) without hierarchical control Force applied to the mirror with hierarchical control (same a.u.) with tidal control & re-allocation to the marionette 1 mN IP displacement
19
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 19 zCorr reduction Marionette/RM crossover @5 Hz After reallocation zCorr rms reduced by 100 Allows switching to low noise coil driver (talk by A.Gennai) Without marionette 700 nm rms With marionette 7 nm rms
20
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 20 Automation
21
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 21 Automation Lock Acq procedure fully automated 5 mins Lock to DF variable finesse AA ON OMC lock Marionette Low noise CD technique Lines ON
22
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 22 C7 run Many new features implemented, good sensitivity improvement NS/NS inspiral range beyond Andromeda New run decided before ITF scheduled shutdown C7: 14-19 September
23
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 23 C7 vs C6 sensitivity
24
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 24 C7 duty cycle Too many improvements in a short A couple of stormy days duty cycle worse than C6 …though still good Locked: 70% Science mode: 64%
25
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 25 C7 inspiral range Best range: 1.65 Mpc for NS/NS, 8.6 Mpc for BH/BH
26
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 26 C6 C7 Mpc
27
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 27 DA commissioning Two online analysis for chirp detection running NS/NS events injected September 19 September 15 Injected events 1.2-1.6 S.M. Grid 1-3 S.M. Grid
28
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 28
29
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 29
30
Virgo upgrades (Oct-Dec 2005)
31
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 31 Problems with injection system A small fraction (bigger than expected) of the light reflected by the interferometer is retro-diffused by the input mode cleaner mirror: spurious interference Temporary solution: reduce the power (/10). Virgo has been working with P in =0.7 W Final solution: install a Faraday isolator A new injection bench is needed. Frequency noiseRecycling mirror: - aligned - not aligned
32
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 32 Injection bench upgrade New bench: –Larger surface available for optics mounting –Higher rigidity –New wires Faraday isolator TGG (Terbium Gallium Garnet) produced by EOTec: –Compliant with 20 W laser –40 dB isolation measured Brewster dielectric polarizers Rotator
33
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 33 PR mirror: curved and compound –Nasty internal resonances, very annoying for the locking –Misalignments and jitter induced by translation To be replaced with a standard flat Virgo mirror PR transfer function PR mirror replacement
34
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 34 Progress summary
35
Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 35 2006 plan Get close to DESIGN SENSITIVITY Make a SCIENCE RUN
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.