1
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar. 2008
2
Beam diagnostics control for J-PARC LINAC2 Content Overview of J-PARC LINAC IOC Development OPI Presentation Beam Observation Performance Summary
3
Mar. 2008 Beam diagnostics control for J-PARC LINAC3 Major Parameters Particles: H - (negative hydrogen) Energy:181 MeV, The last two SDTLs are debunchers (400 MeV for ACS, 600 MeV for SCL) Peak current:30 mA(50 mA for 1MW at 3GeV) Repetition:25 Hz (additional 25 Hz for ADS application) Pulse width:0.5 msec 181(191)MeV (400MeV) (600MeV ) L3BT 1. Overview of J-PARC LINAC
4
Mar. 2008 Beam diagnostics control for J-PARC LINAC4 Beam diagnostics Device TypesPurposeTotal SCT (Slow Current Transformer) Beam Current38 FCT (Fast Current Transformer) Beam Phase/Energy61 Digital Switcher for phase detector Dynamic Range Change21 BPM (Beam Position Monitor) Beam Orbit102 WSM (Wire Scanner Monitor) Beam Size/Profile36 BLM (Beam Loss Monitor)Beam Loss58 1. Overview of J-PARC LINAC
5
Mar. 2008 Beam diagnostics control for J-PARC LINAC5 2. IOC Development Hardware Interfaces of Monitor Control WE modules from Yokogawa Digitizer module for data acquisition WE7118: 100MS/s, 14-bit resolution, 2 channels for BPM, FCT & WSM WE7111: 100MS/s, 8-bit resolution, 1 channel for SCT and BLM Digital switcher for phase detector WE7262: DIO module WER modules Home-made Wave-Endless-Recorder. 200MS/s, 12-bit resolution, 4 channels for BPM 10MS/s, 12-bit resolution, 4 channels for BLM
6
Mar. 2008 Beam diagnostics control for J-PARC LINAC6 2. IOC Development IOC for WE control DAQ: By IOC directly IOC: H/W: Advme7501 VME-SBC (PowerPC) S/W: OS: vxWorks 5.5.1; EPICS: 3.14.8.2
7
Mar. 2008 Beam diagnostics control for J-PARC LINAC7 2. IOC Development IOC for WER control DAQ: Rack-mounted Server: A Java based Application (METIS) IOC: H/W: Rack-mounted Server (Intel-based) S/W: OS: RHEL 4 (Nahant); EPICS: 3.14.9
8
Mar. 2008 Beam diagnostics control for J-PARC LINAC8 3. OPI Presentation Beam current SCT waveform MEDM based Confirmed beam 1 st day of 1 st beam study Beam current EDM based High intensity beam study Confirmed beam @ 25mA
9
Mar. 2008 Beam diagnostics control for J-PARC LINAC9 3. OPI Presentation Beam delivery 1st beam observation at 30º dump (RUN3 ) 181MeV, 5.5mA, 20μs, 2.5Hz SCT SCT Waveform 2mA 40 s 30º dump 0º dump beam Bend magnets
10
Mar. 2008 Beam diagnostics control for J-PARC LINAC10 3. OPI Presentation Beam position 181MeV, 25mA on May, 2007 Waveform (MEDM) Orbit (JCE Based) JCE: J-PARC Commissioning Environment
11
Mar. 2008 Beam diagnostics control for J-PARC LINAC11 May 24 SDTL02BX SDTL03AX Good position stability up to the SDTL-2 was performed, but positions were moving after the SDTL-3 in 0.5-1 hour cycle. We suspected a Q-magnet rare short, higher order mode in the cavity, etc., for this instability. 4. Beam Observation BPM Monitor: Beam Position Stability
12
Mar. 2008 Beam diagnostics control for J-PARC LINAC12 Reason: The frame of the wire scanner is made of ceramics. Electrons from the cavity charge up the frame, and induced voltage steers the beam. 4. Beam Observation
13
Mar. 2008 Beam diagnostics control for J-PARC LINAC13 After making new frame of the wire scanner, a clear beam orbit jump was not seen. SDTL05A 4. Beam Observation September 29 BPM Monitor: Beam Position Stability
14
Mar. 2008 Beam diagnostics control for J-PARC LINAC14 Horizontal Last BPM 2nd last BPM Vertical Last BPM 2nd last BPM Last 2 BPM’s in L3BT injection line Last 2 BPM’s in L3BT injection line The position jitter at the RCS injection is around ±0.2 mm (60 m in RMS) including the intrinsic jitter (or noise) of the monitor system. RUN12 These 2 BPM’s are 4.1 m apart. BPM Monitor: Beam position jitter 4. Beam Observation
15
Mar. 2008 Beam diagnostics control for J-PARC LINAC15 Wire Scanner: Typical horizontal profile WS53 WS55 WS57 WS59 Noisy 25mA Collimator section Slight halo Slight halo observed in the horizontal direction. 4. Beam Observation
16
Mar. 2008 Beam diagnostics control for J-PARC LINAC16 WS53 WS55 WS57 WS59 Noisy 25mA Collimator section More profound halo is observed in the vertical direction. 4. Beam Observation Wire Scanner: Typical horizontal profile
17
Mar. 2008 Beam diagnostics control for J-PARC LINAC17 5. IOC Performance Resource using ratio (repetition: 2.5Hz) CPU usage:< 40% Memory usage: ~ 25% Performance Repetition rate: up to 6Hz Satisfy current requirement of beam commissioning (2.5~5Hz) Achieved WE hardware limit During Beam commissioning CPU Usage Memory Usage
18
Mar. 2008 Beam diagnostics control for J-PARC LINAC18 6. Summary Beam Diagnostics Control for J-PARC LINAC Two type hardware interfaces are employed Commercial hardware: WE from Yokogawa Module based, Compact digitizer Home-made digitizer: WER EPICS based IOC: EPICS R3.14.8.2+vxWorks5.5.1 EPICS R3.14.9+RHEL 4 OPI MEDM, EDM, JCE App Effective beam commissioning with the support of diagnostics control The control of beam diagnostics proved their usefulness in the beam status observation, and the beam commissioning