Download presentation
Presentation is loading. Please wait.
Published byIra Hampton Modified over 9 years ago
1
Center for Built Environment and Infrastructure Studies (CBEIS) 2014 The Best Urban BMP in the Bay Award (BUBBA) “First Place Winner” Best Combination of BMPs in a Series
2
GREEN ROOF 6,350 sq.ft. green roof area that drains to bio-retention area below.
3
PERVIOUS PAVERS 5,355 sq.ft. pervious paver area that drains to stone under layer and overflows into the adjacent bio-retentions area.
4
BIO-RETENTION AREAS (Pretreatment and Water Quality) Front 1,975 cu.ft. area that receives overflow from the pervious pavers and a rear 2,348 cu.ft. area that receives over flow from both the green roof and the internal cisterns.
5
RAIN WATER HARVESTING Roof water is collected in twin 2,000 gallon cisterns and then undergoes a filtering process for utilization in the gray water reuse system. The overflow is directed to the rear bio-retention area.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.