Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction Industry Institute (CII) Penn State Office of Physical Plant (OPP) PACE
2
Conference Call Agenda 1.Introductions 2.Progress Report 3.Discussion of Project and Progress 4.Set Up Next Meeting Time
3
Team Members Board of Advisory Deke Smith – Executive Director of buildingSMART Alliance (Industry Champion) Victor Sanvido – Ph.D., Senior Vice President, Southland Industries Francois Grobler – Ph.D., US Army CERL and IAI - North America Steve Hagan – Project Knowledge Center, U.S. General Services Administration Soad Kousheshi – President, AEC Strategy Ed Gannon – Manager of Design Services, Penn State Office of Physical Plant Mark Falzarano – Barton Malow Company Mark Butler – HDR CIC Research Program Team Members John Messner – Director of the CIC Research Program Chimay Anumba – Professor and Head of Architectural Engineering Sam Hunter – Assist. Professor of Psychology Craig Dubler – PhD Student, Architectural Engineering (Construction) Colleen Kasprzak – MS Student, Architectural Engineering (Operations) Chitwan Saluja – MS Student, Architectural Engineering (Planning) Nevena Zikic – MS Student, Architectural Engineering (Design) Shane Goodman – BAE/MAE Student, Architectural Engineering Sponsor Represenatives Bob Tener – Director, The Charles Pankow Foundation Steve Thomas – Director of Research, The Construction Industry Institute
4
Progress Report Continuing to develop initial concept for BIM Execution Planning Process. Interview process underway. Content analysis performed on completed interviews. Developed initial BIM goals for BIM Execution Planning course for fall 2008, started today.
5
Decision Matrix Project Characteristics + BIM Objectives Guide for Implementation BIM Goals BIM Execution Planning Decision Support Tool
6
Decision Matrix Based on project characteristics: Product/Building Is the building MEP intensive? Organization Does the company have appropriate experience? Does the company have the appropriate tools? Process Is the project fast tracked? Is the project cost driven? Environment What are the local codes? What are the critical access points? Commitment/Contract What is the project delivery system? This information can also be used for a BIM project rating system.
7
What’s Next Continual Development of Guide Process Interviews – complete list of uses Case Study Visits BIM Ex Course – AE 597G Research and Document BIM Goals Case Study Review
8
Discussion Ways that you can help us: Feedback Interviewees Case Studies Class Presentations Projects to test drive BIM Execution Plan Process
9
Thank You Next Meeting Time?