Download presentation
Presentation is loading. Please wait.
Published byHarvey Harris Modified over 9 years ago
1
The New & Improved
2
APW Worksheet & Database To obtain a blank excel and/or access file of the APW, you can download them from our website at: http://www.dot.state.fl.us/statematerialsoffice/pavement/asph alt/fieldoperations/worksheets/worksheetshome.shtm http://www.dot.state.fl.us/statematerialsoffice/pavement/asph alt/fieldoperations/worksheets/worksheetshome.shtm The APW.xlsm (excel file) and APW.mdb (access file) need to be saved with the same name and in the same location on your computer.
3
Sample Header Information
4
Single Sample Login Information (Header) & Menu Options No More LIMS Spec “200207” and Spec Authority “Std Spec 334”
5
Project ID & Pay Item
6
Plant
7
Mix Design No.
8
Upload / Save / Load / PDF / Mix Summary Report / Clear
9
OLDNEW
10
Upload to LIMS
11
Upload to LIMS – Test Validation
12
Save Samples
13
Load Samples
14
Load Sample Header
15
PDF
16
Mix Summary Report
17
Mix Design Summary Report
18
Clear Menu Clears only the worksheet data, leaves header information. Clears all worksheets and all data. Clears all worksheets, all data, refresh lists, and saves the excel file.
19
Help / Configuration / Sample Numbers / Comparison Reporting
20
Help & Configuration Buttons
21
Sample Numbers At least one sample needs to be loaded into the worksheet before using the ‘Sample Numbers’ function ‘Sample Numbers’ is a function for QC, PC, and IV sample levels only
22
Comparison Reporting Prior to click on the Comparison Reporting button, you need to have run the Mix Summary Report for a specific project number.
23
Any Questions on the Header?
24
Test Data and Sample Levels
25
QC Samples
26
Comments & CPF Summary You can enter your LIMS ID number here when you receive the message from LIMS and it will save with your sample. Limit Comments to 60 characters.
27
Roadway G mb & Volumetrics
28
Full Sample Upload If all data – plant and roadway cores – upload complete sample into LIMS.
29
Separate Core Data Upload Option to upload Roadway core data after your plant data.
30
Separate Core Data Upload
33
The good kind of error?!
34
V Samples
35
V Samples – No Resolution
36
V Sample with Resolution
37
Lot Info & Random Numbers Limit Comments to 60 Characters
38
CPF Worksheet Limit Comments to 60 Characters BEFORE AFTER
39
Auto-Fill CPF Worksheet
42
IV Samples
43
IV Report
44
IV Comparisons
46
Segregation Cores
47
Spec Year Check
48
Spec Year (Not Verified)
49
Spec Year (Verified)
50
Contact Marcus Madison Marcus.Madison@dot.state.fl.us (352) 955-6646 Victor Marik (PM) Victor.Marik@dot.state.fl.us (352) 955-2932 Tanya Nash Tanya.Nash@dot.state.fl.us (352) 955-2903
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.