Download presentation
Presentation is loading. Please wait.
Published byHollie Moody Modified over 9 years ago
1
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All TTA activities since GSC-15 Keun Hyeob LEE TTA President Document No: GSC16-PLEN-27 Source: TTA Contact: Peter J. Kim GSC Session: PLENARY Agenda Item: 4.8
2
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 2 Highlight of Current Activities Since GSC-15 –Established 471 standards Sep. 2010 ~ Sep. 2011 –Established 3 New Project Groups & 1 New PCG PG: Magnetic Field Communication, Cyber Physical Systems, Wireless Mobile Charging & Application Wireless Power Transmission PCG (Project Coordination Group) Total of 64 PGs (see Supplementary slide 2 for details) as of Sep. 2011 –Accredited 38 Domestic Standardization Fora
3
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 Cloud Computing –Domestic Standardization based on IaaS (Infrastructure as a Services) priority needs (2010~2012) –SLA Quality parameter of Public Cloud Services in e-Government of Korea Standardization on Metering/Billing system 3 Highlight of Current Activities
4
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 Highlight of Current Activities ICT and Climate Change -Established 3 standards (i.e. Green data centers development best practices) and 6 Technical Reports (i.e. ICT&CC – Direct and indirect impacts) through joint effort among TTA, RRA and ICT&CC Forum NGN RFID ITS etc. ICT & CC
5
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 ICT and Climate Change –Hosted ITU-T SG5 (Seoul, Sep. 20-28, 2011) –Standardization on: Methodologies of Greenhouse gas’ environmental impacts Rare metals Green data centers development best practices 5 Highlight of Current Activities
6
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 6 Highlight of Current Activities IMT-Advanced –Approved LTE-Advanced and Wireless MAN-Advanced as TTA standards –Submitted transposition references for Recommendation ITU-R M.[IMT.RSPEC] to WP5D (Sep. 2011) TTAT.3G-36.101(R10-10.3.0) etc..(same as 3GPP Rel.10 specifications (Aug. 26 2011)) TTAE.IE-802.16m etc (same as IEEE 802.16 standards (16-2009, 16j, 16h, 16m) (Jun. 29 2011)) ITU-R M.1645 (Jun. 2003) IMT-Advanced will encompass the capabilities of previous systems 1101001000 Enhancement Peak useful data rate (Mbit/s) Mobility High Low New mobile access New nomadic/local area wireless access Enh a nced IMT-2000 New capabilities of IMT-Advanced Dashed line indicates that the exact data rates associated with IMT-Advanced are not yet determined LTE-Adv. IEEE802.16m WCDMA cdma2000 LTE M-WiMAX
7
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 7 Highlight of Current Activities Korean Public Alert System (KPAS) –Public alert message over cellular is being provided only in 2G –No alert services in 3G networks such as WCDMA and HSPA –Provision of 800MHz band LTE commercial service by two operators (SKT and LG U+) in Jul. 2011 –Developed standard based on CMAS and will be enforced by NEMA (National Emergency Management Agency) by 2012
8
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 8 Highlight of Current Activities M2M –Recognized M2M as one of 10 future ICT services by the Korean government (May 2010) –Korea Telco’s(SKT, KT, LGU+) current market size is 1.75 mil. subscribers and potential demand for M2M by 2015 is estimated at 14.5 mil. subscribers –Major business model is Customized service, Smart & Safety, Intelligent vehicle, Public SOC(Social Overhead Capital) –Established TTA M2M PG(Dec. 2010) to standardize open M2M platform interface based on commercial mobile communication network
9
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 9 Highlight of Current Activities Wireless Charging –Established TTA Wireless Charging and Application PG Work scope : Standard roadmap, Power transfer interface, Control mechanism –Currently discussing Interface protocol and Evaluation Methodology of Wireless Power Transfer – No communication network Lack of mobility Rechargeable toothbrush, mobile phone, etc Peer-to-Peer Wired Limited convenience 1:1 Charging Wired Charging Require communication network Better convenience and mobility Nonrecognition charging Remote Charging Wireless
10
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 10 Challenges Global partnership collaboration among SDOs in the areas of –Cloud Computing : Definition, Terminology, Reference Architecture –Wireless Charging : Common/Global frequency standardization
11
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 11 Challenges Inter-sectoral collaboration between ICT industry and other vertical industries –M2M collaboration among Smart Grid, ITS, u-Health and Home-automation industry. –Wireless Charging collaboration among auto manufacturers Testing of Wireless Charging Bus at Seoul Grand Amusement Park
12
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 12 Next Steps / Actions Develop “Requirements of Cloud computing services” and “Reference model for Privacy of Cloud computing services” by Dec. 2011 M2M Global initiative activities in the M2M area Further development of Wireless Mobile Charging roadmap and standards
13
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 13 Supplementary Slides
14
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 14 1. TTA Standards at a glace
15
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC16-PLEN-27 2. TTA Standardization Committee (as of Sep. 2011) * Newly Established in 2011 15 ) Technical Committees (TC) Project Groups (PG) Technical Assembly (TA) Coordination Committee (CC) Coordination Committee (CC) Future Internet, NGN, IPTV, etc. Telecommunication(TC2) WGs NGN Evolution, etc Magnetic Field Comm.*, LBS, etc. Radio Communication (TC3) ZigBee/WPAN, etc u-Health, Multimedia, etc. IT Application (TC4) Grid Accounting, etc Cloud Computing, Cyber Security, etc. Information Security (TC5) Cyber Physical Systems*, etc. Infra Software (TC6) Mobile Web, etc. Wireless Mobile Charging & Application*, etc. Mobile Communication (TC7) Radio Access, etc 3D TV, DMB, Digital TV, etc. Broadcasting (TC8) DMB, etc 20 17 11 3 23 5 15 8 13 5 8 9 6 Project Coordination Group (PCG)* Project Coordination Group (PCG)* ICT & CC, etc 3 64 79 Strategy Planning Committee (SPC) Strategy Planning Committee (SPC)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.