Presentation is loading. Please wait.

Presentation is loading. Please wait.

REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.

Similar presentations


Presentation on theme: "REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training."— Presentation transcript:

1 REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training

2 State & Federal Regulations  National Pollution Discharge Elimination System (NPDES) permits  Phase I & Phase II MS4 Stormwater Permits  General Industrial Stormwater Permit  Wastewater Discharge Permit  Construction Permits  Georgia Erosion & Sedimentation Act  Total Maximum Daily Loads (TMDLs)  National Flood Insurance Program  Regional & State Planning

3 NPDES MS4 Stormwater Permit Program  Regulations require permittees to develop a stormwater management program (SWMP) designed to prevent the discharge of stormwater pollutants into the MS4  The first Phase I permit in Georgia was issued in 1994.  The Phase II permit was issued in Georgia in 2002.  The next round of NPDES Phase I Stormwater Permit will be renewed in 2009 & 2010.  New Phase II communities will be designated in 2012 after the next census data is issued.

4 NPDES SWMP Requirements  Drainage System Operations & Maintenance  Illicit Discharge Detection & Elimination  Waste Handling & Industrial Facilities Pollution Controls  Construction Site Structural & Non-Structural Controls  303 (d) Listed Waterways  Public Education  Public Involvement  Illicit Discharge Detection  Erosion & Sedimentation  Post Construction  Good Housekeeping Phase IPhase II

5 What if local governments don’t comply with the regulations?  EPD Enforcement – Hammer & Carrot  Correspondence  Administrative Fines ($50,000/day/violation)  Conditional Compliance with NPDES Permits & Water Withdrawal Permits  Loss of Qualified Local Government Status  State Funding  Public Relations “Challenge”

6 NPDES Industrial General Permit  Requires Site-Specific Stormwater Pollution Prevention Plan  Local Government Exemption Expired 2003  NOI revised in 2006  TMDL Monitoring Required  Annual Reporting  First Annual Reports Due October 2007/2008  Notice of Violation issues to local government in 2007

7 NPDES Wastewater Discharge Permits  Development Regulation/Legal Authority  Structural and Non-Structural BMPs  Public Education  Inspection  Detention Pond retrofits  Water Quality Trend Monitoring

8 National Flood Insurance Program  Requires Flood Damage Prevention Ordinance  Recent Digital Flood Insurance Rate Map (DFIRM) update  Community Rating System (CRS) status and lower local insurance rates

9 State & Regional Drivers for Local Stormwater Management


Download ppt "REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training."

Similar presentations


Ads by Google