Download presentation
Presentation is loading. Please wait.
Published byLawrence Hawkins Modified over 9 years ago
1
Carlton Elementary School – Salem MA
2
Outside front entrance
3
Outside front view
4
Marine/wave motif repeated in school
5
Science room
7
Passage to greenhouse
8
Touch tank
9
Control panel & Batteries for photovoltaics, wind turbine
10
Greenhouse Photovoltaics on roof glazing Main banks on roof
12
Gymnasium Illuminated by natural light Prismatic skylights capture ambient light No lights on!
14
Lights in corridor minimize glare Note wave design in floor
15
Audicafeterium
17
Teachers room Most support rooms were kept in middle of building Classroom has windows –support rooms do not Exception - Admin wing is next to front door
18
Roof painted white to limit heat absorption
19
Light-collecting skylights for gym
20
Wind turbine Demonstration project only
21
Photovoltaic array
23
Front entry
24
Front entry – second level
25
Kindergarten room
26
Library
27
Carlton E-School - 2004 Replaced outdate poorly- constructed/designed 1952 school Capacity: 250 K-Grade 5 plus pre-school (Headstart) Enrollment: 250 kids (150 are city Headstart) Construction cost: $9 million
28
Green innovations Automatic room lights Light collecting skylights Double-glazed windows Photovoltaics Wind turbine Recyclable lunch materials MTC funding SBA refund – 90% of construction cost
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.