Download presentation
Presentation is loading. Please wait.
Published byMiles Armstrong Modified over 9 years ago
1
Phil Nyegaard Public Utility Commission State of Oregon January 11, 2006 Creating an Extended Area Service (EAS) Region
2
2 Overview of Presentation Explanation of EAS and process for getting it EAS region process Answers to specific questions
3
3 Defining Some Terms Access Charge – A charge from local phone companies to long distance companies for use of their facilities Exchange – The local calling area (Geographic area covered by flat local charge) EAS Route – EAS between two exchanges Flat Rate – A constant monthly charge Measured Rate – A per minute charge Toll – Another word for long distance
4
4 What is EAS? A replacement for long distance (toll) service Inter-exchange service Two rate options: Flat rate Measured rate Can switch back and forth for 6 months without charge 2,008 EAS routes in Oregon 182 EAS routes in Lane, Linn, Benton, and Lincoln counties If four county region created, 2,170 new routes would be added
5
5 Advantages of EAS Cheaper calling for some customers to neighboring exchanges Minimizes impacts of outdated exchange boundaries
6
6 Disadvantages of EAS Necessarily involves raising some customer bills while lowering others In a few cases, leads to local rate increases EAS rates not uniform Customers of small companies generally pay more
7
7 EAS Regions vs Individual EAS Routes Individual EAS Routes Most common form of EAS Appropriate when a particular EAS route desired Routes can be added incrementally EAS Regions Two regions (Portland and Southern Oregon) exist in Oregon Appropriate when multiple exchanges all want uniform access to each other
8
8 Revenue Neutrality Policy Adding EAS routes may not affect phone company earnings Increased profits unacceptable to customers and PUC Phone companies cannot be ordered to lose money Reality of revenue neutrality: Higher bills for some customers Lower bills for others
9
9 Individual EAS Route Process Phase 1: Petitioning Community of Interest Phase 2: Costs/Rates Staff Investigation Stipulation Commission Order EAS Deployment
10
10 EAS Region Process In general terms, this is the process: Investigation opened if broad support from cities, counties, and legislators is evident If there isn’t broad support, alternative region could be proposed, or idea dropped Establish region boundaries Calculate EAS rates for all exchanges Present rates to customers at public comment hearings and/or polling PUC decision based upon customer reaction Implementation of region, if authorized No petitions required
11
11 Setting Region Boundaries Input from four counties essential PUC would work with legislators to create advisory task force Up to 12 members Comprised of affected citizens Task force would make recommendations to the PUC Oregon law requires final boundary decision to be made by PUC
12
12
13
13 Calculation of EAS Rates (Cost Basis) Some PUC-approved costs recovered through toll or access charges EAS causes loss of toll and access revenues EAS creates new costs EAS increases number and duration of calls Increased traffic requires new facilities New facilities are a cost of EAS EAS rates = lost revenues + new costs
14
14 Calculation of EAS Rates (Types) Two types of EAS rates Flat rate (higher for business) Measured rate In a few cases, a local rate increase needed Only done to avoid high flat EAS rate Has never happened for large phone companies
15
15 Calculation of EAS Rates (Process) Companies file proposed rates Company rate proposal based on recent traffic (usage) data PUC staff analyzes proposed rates and traffic data PUC staff and companies negotiate rate stipulation
16
16 Presentation of Rates to Customers Done at public comment hearings in region In some cases, customer balloting is done No EAS if rates unacceptable to customers
17
17 Commission Order Would be issued after public comment phase Would be issued about 12 months after region boundaries set
18
18 Implementation of EAS Region If region established by PUC, implementation would take up to six months Phone companies need time to plan and install new facilities Without new facilities, “fast busy” problem would occur
19
19 Portland EAS Region First EAS Region in Oregon 33 exchanges, operated by ten phone companies – approximately one million access lines Flat EAS Rates in Portland EAS Region Range from $2.20 to $21.35 for residential service Range from $3.27 to $28.40 for business service Measured EAS rate 8 cents/minute or less
20
20 Southern Oregon EAS Region Implemented in October 2004 18 exchanges, operated by four phone companies – approximately 150,000 access lines Flat EAS Rates in Southern Oregon EAS Region Range from $2.20 to $12.04 for residential service Range from $3.27 to $24.08 for business service Measured EAS rate 6 cents/minute or less
21
21 Proposed Four County EAS Region Would involve ten phone companies Approximately 71% of affected access lines served by Qwest Would include 49 exchanges – approximately 246,000 access lines Would actually cover slightly more than four counties
22
22 Area Code Observation 43 of 49 exchanges in four counties are in 541 area code If the six (6) 503/971 exchanges included in EAS region, entire 541 area code would need to go to 10 digit dialing immediately 541 area code will go to 10 digit dialing in about 2010 anyway If the six (6) 503/971 exchanges dropped from proposed region, number of companies involved would drop from ten to six
23
23 Rate Bands Telephone companies don’t set a unique EAS rate for each exchange Instead they use EAS rate bands A company’s rate band applies to its entire service territory The more people you can call toll free, the higher your EAS rate
24
24 Rate Bands (continued) Current QWEST EAS Rate Matrix Business Rates EAS Band Accessible EAS Lines Residentia l Rates $7.49C600,001 - 999,000$4.97 $1.95A1 - 50,000$1.28 $3.27B50,001 - 600,000$2.20 29 exchanges in Band A 29 exchanges in Band B 6 exchanges in Band C
25
25 Rate Band Effect of a Four County EAS Expansion on Qwest Eight exchanges would move from Rate Band A to B Corvallis, Eugene-Springfield, Florence, Mapleton, Newport, Siletz, Toledo, and Jefferson All else equal, the residential EAS surcharge for these exchanges would increase from $1.28 per month to $2.20 per month Creation of new region would also increase rates to cover implementation costs Qwest customers outside of new region would see higher rates, too Other telephone company rate bands would produce a similar result
26
26 Specific Questions What would four county region rates be? Why not have a uniform flat rate for the region? Would region “cherry picking” be allowed? Would there be a trial period for the EAS region? Would exchanges outside region be allowed to keep current EAS routes? Would exchanges outside region be allowed new individual routes within region? How would the new region’s EAS rate coordinate with Nationwide toll plans?
27
27 What Would Four County Region Rates Be? Rates cannot be calculated until final boundaries set Portland and Southern Oregon rates provide general insights Rates would vary among exchanges and companies Flat rates would generally be higher for smaller companies because of smaller customer base
28
28 Why Not Have a Uniform Flat Rate for the Region? This idea considered, but not adopted, for previous regions Two major problems Companies do not have same costs Costs would have to be pooled High potential for unhappiness in Qwest exchanges because of higher bills despite lower costs Could cause excessive use of measured rate Ramifications for all Oregon EAS
29
29 Would Region “Cherry Picking” be Allowed? No. Customers/exchanges would have access to uniform region “Cherry picking” would add substantial complexity: Uniform 49 exchange region would require 2,352 analyses of traffic and engineering data to set rates Complex analyses of adequacy of facilities
30
30 … “Cherry Picking” (continued) Exchange “cherry picking” could require Thousands of additional traffic analyses More complex facility analyses Customer “cherry picking” could require Millions of traffic analyses Even more complex facility analyses Access to individual calling data
31
31 Would There be a Trial Period for the EAS Region? No. Allowing customers/exchanges to drop out would change rates of remaining customers In extreme case, future of region could be jeopardized
32
32 Would Exchanges Outside Region be Allowed to Keep Current EAS Routes? Yes, even though doing so permits “toll avoidance” strategy
33
33 Would Exchanges Outside Region be Allowed New Individual Routes Within Region? No, because of “toll avoidance” concerns Outside exchanges would be allowed to join entire region
34
34 How Would the New Region’s EAS Rate Coordinate with Nationwide Toll Plans? Many customers have a Nationwide Toll Plan with their toll carrier. Maximum flat rate for unlimited nationwide calling Includes interstate calls and intrastate calls EAS rate would be in addition to a Nationwide Toll Plan Flat rate or Measured EAS is billed by local carrier Nationwide Toll Plan is billed by toll carrier
35
Thank you for your time This presentation and other EAS information is available at www.puc.state.or.us
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.