Download presentation
Presentation is loading. Please wait.
Published byEric Stokes Modified over 9 years ago
1
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration
2
LS1 GE1/1 Super Chamber – Powering and Signals GEM Technical Review2 2 x HV Lines (8mm-diam) to USC 4 x LV Lines (10mm-diam) 4 x Fiber lines to USC GE1/1 PP To UXC YE-1 Tower 4 x Fiber lines to PP CSC TMB YE-1 X1 2 HV Lines to USC 4 LV Lines to UXC YE-1 Towers 8 Fibers (cable with 12 fibers) 4 lines to USC 4 lines to CSC TMB Via trigger tunnel 18/02/2013
3
Services for GE1/1 Project During LS1 I have to install and commission all the services needed for the CY2016 slice test Gas and Cooling are defined. Cables and connections are still under discussions. – HV lines – Defined OK – Fiber cables – Not defined yet. – LV lines – Not defined yet. – Cu Lines for control and signals – Not defined yet.
4
To Summaries In order to have the cable services installed in time we should freeze the floating points above very soon. Routing of spare lines can be an option. Once we declare our cable schema in front of the CMS coordinators there will be no change after.
5
Development of the Multilayer GEM PCB A small 30x30 cm^2 strips board was fabricated The design of a trial 30x30 cm^2 multilayer PCB is under way. A electrical diagram for the connections needs to be made ASAP. If the noise tests are showing no perturbation of the signal due to the VFAT digital activity we can launch the design of the full-size Multilayer GEM PCB for connections and Power.
6
30x30 cm^2 Test Board
8
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.