Download presentation
Presentation is loading. Please wait.
Published byRichard Gardner Modified over 9 years ago
1
fcgkj ljdkj vkink izca/ku foHkkx foHkkx ds }kjk dh xbZ ck<+ iwoZ rS;kjh
2
jkT; fu;a=.k d{k fnukad 15-06-2013 ls fdz;k’khy nwjHkk"k la[;k% 0612& 2217305@2217786
3
lalk/ku ekufp=.k lkexzh lalk/ku iwjkuh ns’kh ukosa@ubZ ns’kh ukosa@eksVjcksV@ykbZQ tSdsV@ VsaV@ egktky@th0ih0,l0 lsV@ lSVsykbZV Qksu@ikWfyfFku 'khV~l@ [kk|kUu@ nokbZ;ka Ekkuo cy,u0Mh0vkj0,Q0@,l0Mh0vkj0,Q0 xksrk[kksj eksVjcksV pkyd jkgr cpko ny izf'kf{kr Lo;alsod vkoaVu
4
miyC/k lkexzh lalk/ku ( Material Resources) vkink izca/ku foHkkx] fcgkj ljdkj
5
ftyksa esa miyC/k lkexzh lalk/ku ( Material Resources) ( Material Resources) fofHkUu ftyksa es miyC/k dqy ikWyhFkhu ’khV~l & 180000
6
ftykokj lalk/kuksa dh miyC/krk
7
Lkjdkjh ns’kh uko dh miyC/krk dqy 2162 y[khljk; & 22
8
ftykokj lalk/kuksa dh miyC/krk,Q 0 vkj 0 ih 0 cksV & 40
9
ftykokj lalk/kuksa dh miyC/krk
11
ftykokj lalk/kuksa dh miyC/krk ftykokj lalk/kuksa dh miyC/krk
12
ftykokj lalk/kuksa dh miyC/krk
13
iwohZpEikj.k e/kq cuh lqikS y njHk axk e/ksi qjk lgjlk eqt¶Qjiqjcsxqljk; Hkkxyiqjvjfj;k iwf.kZ;k Wa iVuk
14
NDRF,oa SDRF nyksa dh ck<+ izo.k ftyksa esa iwoZ izfrfu;qfDr NDRF,oaa SDRF dh,d&,d Vhesa eqtQ~Qjiqj] xksikyxat,oa lqikSy esa izfrfu;qDrA izR;sd Vhe esa 45 toku,oa inkf/kdkjh 'kkfey gSA dzeka d,u0Mh0vkj0,Q0 Vheksa dh vofLFkfr fjLikSal ds {ks=@ ftys 1 lqikSydkslh,oa iwf.kZ;ka izeaMy ds ftys] [kxfM+;k 2 xksikyxatlkj.k ize.My vkSj if’peh pEikj.k 3 eqtQ~Qjiqjfrjgqr,oa njHkaxk izeaMy ds ftys ¼if’peh pEikj.k NksM+dj½ 4 fcgVklHkh vfr ck<+ izo.k,oa ck<+ izo.k,oa vU; ftysa ¼vko’;drkuqlkj½ 5 njHkaxknjHkaxk,oa leLrhiqj 6 Lkhrke<+hlhrke<+h 7 Hkkxyiqjcsxwljk;,oa Hkkxyiqj
15
oÙkZeku esa jkgr,oa cpko dk;ksZa esa layXu,u0Mh0vkj0,Q0@,l0Mh0vkj0,Q0 Vhesa
16
Rofjr fjLikWUl gsrq miyC/k ekuo lalk/ku
17
ftykokj izf’kf{kr ekuo lalk/ku
21
fcgkj ljdkj vkink izca/ku foHkkx foHkkx ds }kjk ck<+ 2013 ds nkSjku fd;s x, v|ru jkgr dk;Z
22
Ckk<+ izHkkfor ftyksa esa jkgr dk;Z ¼2013½ Ykxkrkj---- ---- Øekad ftyk dk uke ck<+ izHkkfo r tula[;k ¼yk[k esa½ pyk;h tk jgh uko e`r O;fDr ck<+ izHkkf or i'kq ¼yk[k esa½ ekuo fpfdRlk f'kfojks a dh la[;k i'kq fpfdRlk dsUnz ksa dh la[;k forj.k [kk|kUu ¼Doha0 ½ uxn jkf'k ¼yk[k :0 esa½ ikyhFkh u 'khV~l ¼la0½ 1 fd'kuxat 2.5111250.02934 0 0 568 2 iwf.kZ;ka 4.43126300320 732822.35 9700 3 vjfj;k 5.9717912000 7 3.6914795 4 dfVgkj 9.1121111.019614003291 5 eqt¶Qjiqj 0.619250.111131 463 1.284528 6 lqikSy 1.2134 0.0750 2823.69 1128 7 lgjlk 0.0550 000 221 3.81133 8 xksikyxat 1.3428 0.1262 2472 20408 9 Hkkxyiqj 0.2854 0.0730 1088 16.321000 10 lkj.k 0.468 0.0184 0 01500 11 iVuk 0.5987 0 05057.57180 12 Hkkstiqj 1.718060.16 610 5.50 185 13 cDlj 0.3601 0 14 oS'kkyh 1.9555 20 125 15 csxwljk; 1.52118------- 16 [kxfM+;k 0.4836------- dqy 32.381500741.57170951236678.7137356
23
Ckk<+ izHkkfor ftyksa esa jkgr dk;Z ¼2013½ Øek ad ftyk dk uke pwM+k ¼Doha0 esa½ xqM ¼Doha0 esa½ eksecÙ kh nh;k lykbZ ikWyh Fkhu 'khV~l fdjklu rsy ¼yhVj esa½ gSykstu VScysV fCyfpax ikmMj ¼fd0xzk0 esa½ 1 fd'kuxat 707.6397.5663686446568 115 0 0 2 iwf.kZ;ka 1505.190.564012009700 00 0 3 vjfj;k 81.3412.6284114214795 0 00 4 dfVgkj 583.3586.821260 3291010249190 5 eqt¶Qjiqj 00004528 300 29790224.75 6 lqikSy 0.450.04001128 0487 0 7 lgjlk 0000133 0 00 8 xksikyxat 0000408 0 550081 9 Hkkxyiqj 44011001000 0 5000 10 lkj.k 5010001500 0 315025 11 iVuk 132.41004818000.000 12 Hkkstiqj 00000000 13 cDlj 33.035000000 14 oS'kkyh 000750000 dqy 3413.9315.928652100963798141549676520.75
24
foHkkx }kjk ck<+ jkgr gsrq fn;s x;s vkoaVu Sl. No. Districts 101-0001- Cash Dole 101-0002- Food Grain 101-0003-Ex. Gratia Grant 101- 0004 Cloths & Utensils 104- 0001 Fodder 105-0001- Vet. Medicine 109- 0001- Sewarag e 112-0002- Evacuati on of Populati on Flood 113-0001 Building Repairs 118-0001- Boat Repair Grand Total 1Patna40.0050.00 60.00 12.00162.00 2Bhojpur29.0049.220.40 41.15 39.00158.77 3Buxar20.0035.00 40.00 10.00105.00 4Saran20.0030.00 40.00 10.00100.00 5Siwan20.0025.00 40.00 10.0095.00 6Gopalganj20.0035.001.0020.00 40.00 10.00126.00 7Muzaffarpur80.00 13.50 70.00 40.00283.50 8Vaishali80.00 50.00 20.00230.00 9Sitamarhi80.00 20.00260.00 10Sheohar50.00 40.00 20.00160.00 11E. Champaran80.00 60.00 20.00240.00 12W.Champaran40.0035.00 40.00 10.00125.00 13Darbhanga60.00 50.001.4020.00191.40 14Madhubani60.00 20.00200.00 15Samastipur60.00 20.00200.00
25
Sl. No. Districts 101-0001- Cash Dole 101-0002- Food Grain 101-0003-Ex. Gratia Grant 101- 0004 Cloths & Utensils 104- 0001 Fodder 105-0001- Vet. Medicine 109- 0001- Sewarag e 112-0002- Evacuati on of Populati on Flood 113-0001 Building Repairs 118-0001- Boat Repair Grand Total 16Begusarai60.00 15.00 40.00 20.00195.00 17Khagaria60.00 40.00 20.00180.00 18Lakhisarai20.0010.00 40.00 24.8594.85 19Bhagalpur60.001492.00 5.0032.005.0090.00 40.001724.00 20Saharsa60.00 50.00 90.82260.82 21Madhepura60.00 40.00 20.00180.00 22Supaul60.00 1.00 42.08 20.00183.08 23Purnea944.863064.0030.50 540.00 10.004589.36 24Katihar810.00188.19 30.00 20.001048.19 25Araria40.0025.00 40.00 40.93145.93 26Kishanganj20.00 0.80 40.00 10.0090.80 27Nalanda40.0020.00 40.001.6610.00111.66 28Shekhpura20.00 40.00 8.0088.00 29 Minor Water Resource Deptt. 150.00 Total Amt. Alloted 2993.865948.4162.2020.005.0032.00155.001843.233.06615.60 11678.3530 0 foHkkx }kjk ck<+ jkgr gsrq fn;s x;s vkoaVu
26
fcgkj esa vYi o"kkZikr ds dkj.k mRiUu fLFkfr ls lacaf/kr izLrqrhdj.k
27
RAINFALL & CROP-COVERAGE Subject 29-07-201305-08-201307-08-2013 Rainfall since 1 st June & Deficiency in percentage 364.1 mm -26% 393.4 mm -30% 401.1 mm -31% Coverage of Paddy in percentage 44.76% (Seeding 93.45%) 53.55% (Seeding 93.45%) 57.25% (Seeding 93.45%) Coverage of maize in percentage 86.61%91.79%92.72% Disbursement of diesel subsidy in Rs Crore (released amount 90 Cr.) NA
28
DISTRICT WISE ANALYSIS –RAINFALL IndicatorNo of distName of Districts Rainfall less than 60% of normal (IMD data) (1 June to 07 Aug) 20Gaya, Lakhisarai, Nawada, Sitamarhi, Vaishali, Sheohar, Patna, Nalanda, Jehanabad, Aurangabad, Muzaffarpur, Samastipur, Sheikhpura, Sharsha, Buxar, Khagariya, Kaimur, Saran, Banka, Gopalganj
29
Rainfall less than 60% of normal (IMD data) (1 June to 07 Aug)
30
STRATEGY (Agriculture) 1.Use of Diesel Subsidy to supplement rainfall for sowing and transplantation to increase coverage Saving standing crops 2.Contingency Crop Plan for uncovered area-supply of seeds 3.All Kisan Salahkar/Scientists to fan out in villages to advise farmers on use of diesel subsidy and contingency plan and by means of press conference, radio talk, Chaupal and through other means of Electronic Annadata program in ETV. 4.Regular advice through AIR 5.Regular Reporting of Coverage of alternate crops. 6.Enhancing the target of maize coverage in South Bihar districts.
31
Status of State Tube wells SubjectUp to 29.7.13Up to 05.08.13 Running Tube wells 3120 Breakdown due to Transformers 4850 No of mechanical breakdown 324 New Tube wells energized 1339 Irrigation in hectares 1912.342821.95
32
STRATEGY (MI) (Directions given in CMG Meeting on 06.08.13) 1.Removal of all mechanical defects 2.Maintenance of a stock of common spare parts and four standby motor pumps for tube wells in every division 3.Replacement of transformers where no other defect 4.Tube well operator on every running tube well – full time. 5.Energisation of new tube wells (RIDF XI) 6.Joint Verification in case of differences with Agriculture Department 7.Monitoring of duration of Power Supply to Tube well. 8.Monitoring of water table of small reservoirs like ponds etc. 9.Direction given to sent separate report of channel repairing
33
IRRIGATION BY WRD ProjectTarget for kharifAchievement on 05.08.13 Percentage Sone E W 154550 396829 40670 167297 26.32 42.16 Kosi E W 291702 58697 130603 31741 44.77 54.08 Gandak E W 292993 189588 77815 116350 26.56 61.37 North Koel6400618822.94 By different Reservoir 191717124256.48 By other means1524981950512.79 Total 179258059828833.3
34
WATER TILL TAIL END Project - Sone Name of Canal Length (in KM) Remarks Total Length Reach of Water 29.7.1305.8.13 Lahthan Vitaranee26.2013.0014.00 Behea Shakaha Nahar49.6044.00 Kattiya Vitaranee34.0022.00 Koilwar Vitaranee46.6032.00 Dalia Narayanpur Vitaranee21.605.008.00 Jaitpur Vitaranee22.405.008.00 Kochas Vitaranee29.1021.0029.10 Manaura Vitaranee20.8016.5020.80 Chanda Vitaranee19.2014.0019.20
35
WATER TILL TAIL END Project – North Koel Name of Canal Length (in KM) Remarks Total Length Reach of Water 29.7.1305.8.13 Naur up vitarnee9.806.00 Riar up Sakha Nahar29.9120.00 Kulharia up vitarnee12.805.00 Mahuari up vitarnee19.805.007.00 Basdiha up vitarnee23.475.0010.00 Karma vitarnee25.9822.87 Kapasya vitarnee18.6412.00 Hetampur up vitarnee9.756.00
36
TREND OF WATER LEVEL IN RESERVOIRS(Water Storage in Acre ft) Name of Reservoir CapacityLevel 01.8.13 Level 06.8.13 Percentage Chandan1100003989393289929.89 Badua89000178101242513.96 Orhani335508700813024.23 Belharna118051540123010.48 Kharagpur L132007860709053.07 Vilashi234001320 5.64 Morve1080010359108.42 Nagi77006805607.27 Nakati113206806155.43 Garhi685001020065259.52 Kohira2221060012755.74
37
Strategy (WRD) 1.Taking water to the last km in tail end of canals by removing silt and repairing banks and by enforcing rotation, if needed 2.Regular Reporting about identified waterways at tail end 3.Taking help of district administration to enforce rotation or prevent abuse of water in upper reaches 4.DMs asked to report if water does not reach the tail end 5.Monitoring of water table of reservoirs
38
STRATEGY (Energy) 1.Assured power supply to Rural Areas for 8 hours within fixed hours 2.Publicity about fixed hours through newspapers/radio 3.Control Room for receiving complaints about non-supply 4.Report about actual supply from DMs/ MWRD/ CM’s Secretariat
39
PROGAMME FOR AFFECTED AREAS Standing crops should be saved by promoting use of diesel subsidy. Unsown area should be covered by alternate Crops like Toria, Kulthi, Arhar, etc. Irrigation Department should provide water to the last km of canals in tail end. New tube wells under RIDF XI should be energised on priority basis at a fast pace. All burnt transformers should be replaced. Electricity supply as per the prescribed schedule to be ensured. All hand pumps to be repaired immediately.
40
PROGAMME FOR AFFECTED AREAS Areas where hand pumps are not available or may dry up in next two months should be identified and new hand pumps installed there in one month on priority basis. Employment generating schemes should be started in all Panchayats under MNREGA-at least two in every Panchayat. Water harvesting structures should be top priority in starting schemes in affected hilly areas, Visit and review of the situation by Secretary/Principal Secretary in-charge of the critical Districts and fortnightly visit and review of the situation by Secretary/Principal Secretary in-charge of other districts
41
Review of Situation 1.Review by Chief Secretary- every Tuesday at 10 A.M. 2.Video conference with DMs- every Monday- 3 PM 3.Review by Cabinet
42
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.