Download presentation
Presentation is loading. Please wait.
Published byJeffery McCoy Modified over 9 years ago
1
California’s Intercity Passenger Rail Network National Model Highest Ridership of Any State VMT Reduction of 355 M Annually $175 M in Annual Wages $4 B Rail Infrastructure Needs
2
Capitol Corridor 3rd Busiest in Amtrak System 2 Owners Highest On-Time Performance $950 M in Infrastructure Needs Capitol Corridor Joint Powers Authority
3
San Joaquin 5th Busiest in Amtrak System 365- mile route/11 counties Extensive Thruway Bus Service $725 M in Infrastructure Needs San Joaquin Joint Powers Authority
4
Pacific Surfliner 2nd Busiest in Amtrak System 7 Owners/5 Operators $1.6 B in Infrastructure Needs LOSSAN Joint Powers Authority
5
Emerging Corridors Coast Daylight from L.A. to San Francisco Capital Corridor Extension to Salinas Coachella Valley Route $650 M in Infrastructure Needs
6
California’s Intercity Passenger Rail Network 10-Year Infrastructure Needs: $Millions CC:$950 SJ:$725 PS:$1,600 Emerg:$650
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.