Direct Strength Prediction of Cold-Formed Steel Beam-Columns Y. Shifferaw, B.W. Schafer Report to AISI February 2012
3
Current Progress
4
Prelim. Formulation (dist. 1 of 2)
5
Prelim. Formulation (dist. 2 of 2)
6
Modeling Nonlinear shell FE models of imperfect CFS member End displacements over desired P, M x, M y Boundary conditions and lengths to isolate local and distortional buckling Preliminary models completed with success
7
P-M major, distortional, C section
8
P-M minor, distortional, C section
9
Local DSM vs minor axis strength bounds for C Potential!
10
Selecting industry relevant beam-columns Trusses
11
Load combinations D+LLD+0.75LL+0.75WD+LL+W Fy (ksi)L- ftWPa-lbMa-ft.lbP- lbMmaxInteractionPM maxInteractionP lbM max- lbinInteraction DEVCO Lower level 600S162-54509 15 psf50981947 3088 lb502lb-ft0.8872576lb536lb-ft0.727 ADTEK-Exterior bearing wall 600S200-54-3rd floor5011.522psf/29p/f70932326.64000479.40.81 600S250-68-2nd floor5010.4222psf/29p/f10711.23251.28300393.60.92 600S250-97-1st floor5010.4222psf/29p/f17399.14801.312600393.60.83 NUCON 1st Exterior End walls 550NF150-43 @16" 501025.17psf3.540kips1.068ft-kips2.383kips0.418ft-kips0.89 1st Exterior walls 550NF150-43 @2" 501025.17psf3.540kips1.068ft-kips1.840kips0.629ft-kips0.92 2nd Exterior walls 550NF150-43@2" 5010.525.01psf3.540kips1.068ft-kips1.280kips0.689ft-kips0.82 1st interior wall at unit AL-A 550NF150- 33@16" 50105psf2.371k0.751ftk2.329k0.083ft-kips0.98 1st interior wall at unit AL-A 350NF150- 43@16" 50105psf2.592k0.588ftk 2.329k0.083ft-kips0.9 Selecting industry relevant beam-columns Framing
12
Selecting efficient sections Most efficient P n /A M n /A
13
Identifying SSMA sections based on limit state
15
Selecting Member length
16
Testing Related recent testing: Basic basis for our forthcoming testing…
17
Current Progress Conclusion: work is modestly behind, but progress being made. Looking forward to providing More results, including testing results, at July meetings.