Published byJames Newman Modified over 9 years ago
1
EDUSAFE System Exploitation next steps Assoc. Professor Katerina Pramatari Vasileios Mantzios (ESR10) Athens University of Economics and Business (AUEB) 22 June 2015
2
WP 5 Overview (1/4) WP5 - Vasileios Mantzios – AUEB – 22 June 2015 WP5: Technology assessment and Exploitation This WP studies how a technology prototype, in this case prepared for the CERN extreme environment: –can be transferred to other industry sectors, and –how to develop and introduce a planning tech-development strategy which incorporates possible technology transfer potential from the start
3
WP 5 Overview (2/4) WP5 - Vasileios Mantzios – AUEB – 22 June 2015 After having analyzed the output of the first Testing Campaign Perform comprehensive Technology Assessment of final prototype Identify Capabilities Identify Exploitable benefits Gather Market input Evaluate the input and markets Target the system and operations of a potential spin off to serve these markets
4
WP 5 Overview (3/4) WP5 - Vasileios Mantzios – AUEB – 22 June 2015 Deliverable reports D5.1 Market study, tech assess. & initial business model D5.2 Annual appraisal of research progress and training D5.3 Technol. assessment & reverse engineering potential D5.4 Business plan, Financial plan, IPR protection plan D5.5 Market feedback on prototype and demonstration D5.6 Presentation of Fellow’s research at end conference
5
WP 5 Overview (4/4) WP5 - Vasileios Mantzios – AUEB – 22 June 2015 Milestone reports MS26 Technology assessment and framework + market study MS27 Reverse engineering methodology completed MS28 Local specific trainings completed MS29 Exploitation plan accepted by all partners
6
Exploitation model alternatives WP5 - Vasileios Mantzios – AUEB – 22 June 2015 Patent and Licensing to companies Research collaboration projects with potential future companies- users Spin-off company, holding the whole IP In case of no quorum interest, the excluded partners will be treated fairly according to FP7 regulation This option may be of more interest, provided that we have an ICT project (harder to patent) and we espouse Open Innovation model
7
Exploitation opportunities WP5 - Vasileios Mantzios – AUEB – 22 June 2015 Medical Applications Maintenance process instruction tool
8
Medical Applications WP5 - Vasileios Mantzios – AUEB – 22 June 2015
9
South by South-west: Interactive Numerous pitching events Entrepreneurship meetups High technologies expos from USA labs Knowledge Transfer Units from Research Organizations (NASA etc.) International high tech startups presentations (Metaio and ODG) International Companies representatives Capital Investors Well-known startups Workshops Networking events The 2 nd most important event for innovation, high tech and entrepreneurship WP5 - Vasileios Mantzios – AUEB – 22 June 2015
10
EDUSAFE @ SXSW Challenging experience 3 pitches in public Numerous contacts and networking Great exposure for EDUSAFE work and all partners WP5 - Vasileios Mantzios – AUEB – 22 June 2015
11
Exploitation opportunity During public pitching event A Director from Samsung USA expressed high interest in our system We organized a site visit at Austin Fab for further discussion. WP5 - Vasileios Mantzios – AUEB – 22 June 2015
12
Samsung Wafers Cleanroom Very clean and good lighted environment Complex maintenance procedure No computer aided process has been applied No robotic process can be applied Big monetary impact of faulty maintenance process No monitoring in the maintenance process High cost for expert trained maintenance personnel Operates 24/7 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
13
Samsung High level requirements Non technical requirements Equipment must be lightweight and comfortable with safety glasses Use server located in Samsung premises Potential future integration with Samsung systems Functional requirements Read instructions Project augmented content for maintenance process Project specific technical info (tolerance values) Verify (with computer vision) if the work performed is correct (tolerance values) Verify component positions (using computer vision), Record snapshots, record video at server voice commands for user interface stream live video to 'supervisor' hear 'supervisor' advice/comments real time WP5 - Vasileios Mantzios – AUEB – 22 June 2015
14
EDUSAFE System components for Samsung PTU hardware Augmented reality glasses Computer vision algorithms Server /DAQ Authoring tool No need, for the time being, for gamma imaging camera WP5 - Vasileios Mantzios – AUEB – 22 June 2015
15
High Level Architecture 15 AR/Supervision camera and LEDs AR glasses PTU and sensor modules Server WP5 - Vasileios Mantzios – AUEB – 22 June 2015
16
Future further collaboration with Samsung Other electronics manufacturers (intel etc) Samsung Shipyards Physical security control systems Communicate with Samsung Korea for further funding and exploitation in other applications (in nuclear industry as well) 16 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
17
Technicalities and contract As a private company, they need to sign contract with a private legal entity The formulation of a spin-off which will hold the EDUSAFE IP is the best option This entity will sign the contract and be the technology and integration provider of EDUSAFE They are about to invest good money (based on my feeling) for our technology, so they need to exclude any bureaucratic procedure. 17 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
18
Current state of communications We initiated the process at SXSW Exchanged initial email to establish contact Their legal department sent via email a signed NDA They are waiting for a Draft DoW ASAP in order to finalize it after some iterations by the end of Summer 18 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
19
Proposition for internal next steps Agree upon an internal Project Leader –AUEB, as the Exploitation Leader and because of its experience, volunteer to invest this effort Gather the interest of partners in the formulation of such a spin-off by the end of this week. Work collaboratively and efficiently to finalize the draft DoW that we will send them. EDUSAFE Coordinator (Olga) will send the email having in cc the rest consortium and internal PL. Internal PL will continue investing effort on this direction informing in parallel all the interested partners and Olga Examine the possibility to protect the Spin-off IPR –Partners not interested in the Spin-off will be treated fairly and according to FP7 policy 19 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
20
Technologies used UBItrack IMU (Sensor fusion) EPFL algorithm WRM algorithm Sensor board Sensors board software PTU hardware PTU software 20 Display hardware Display software Control unit (touch screen etc.) Data Base hardware Data Base software Server hardware Server software Gamma imaging camera Gamma imaging camera software WP5 - Vasileios Mantzios – AUEB – 22 June 2015
21
Technology Assessment Strategy Perform the following assessment to the final technologies to be used based on the feedback we had after the Testing Campaign. Functional Assessment Technical Assessment Non Technical Assessment Cost-Benefit Analysis Exploitation Assessment 21 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
22
Functional Assessment Based on agreed final functional requirements Operational Safety –Level of radiation to which the user is exposed –Time of radiation exposure during use –Physical implications due to extensive use –Mental implications due to extensive use –Long term health implications Training Requirements –Number of training hours required –Training material and equipment required –Special knowledge fields required User Acceptance –Usability of Interfaces (both operator and supervisor) –Physical usability of wearable device –Functionality testing on the field 22 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
23
Technical Assessment Technical Specifications –Number of processors (Gum-stick board and Server) –Processors speed (Gum stick and Server) –Number of servers –System Memory (RAM) –Database capacity –Network Speed Performance Specifications –concurrent users are expected (peak and normal) –Application Workload Mix of each system component (% of activities performed simultaneously) –Maximum acceptable response time for a given activity –Simultaneous users can be served (for a specific network infrastructure) 23 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
24
Technical Assessment (cont.) System Security Assessment –How can the system be accessed (network, modem, wireless)? –Are there appropriate controls and protection in place (Firewalls, Intrusion Detection Systems etc)? –How can the system be accessed (ids, passwords, other identification methods)? –Are data encrypted? –Are there any monitoring processes for data manipulation? –What are the processes for system and file back-ups? –What are the processes for managing system outages and recovery? 24 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
25
Non Technical Assessment Applicability Assessment –Hardware infrastructure hardness –Communication protocols and infrastructure effectiveness Scalability Assessment –Installation time for a specific Organization (render time, augmented content creation, security settings etc.) –Level of dependency in client used technology (current WiFi network, 3D CAD etc.) –Level of client acceptance towards the field penetration needed with markers 25 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
26
Cost Benefit Analysis In terms of: Calculation and comparison of benefits and costs related to the product –Financial cost reduction or income generated from the use of the product versus –costs related to the acquisition, training and operational maintenance of the product. 26 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
27
Exploitation Assessment Roadmap Identification of System capabilities Identification of System benefits to specific setting Identification of exploitable benefits Measure market needs Form a spin-off Transfer all the IP Design specific services and applications for every interesting industry 27 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
28
Next Steps Based on the feedback of Testing Campaign we will: Decide upon the technology to be used in the final prototype Evaluate the ability to serve the initially identified industries Finalize the list of industries and companies to contact Agree upon the contacts list to send an information email –We need to exploit our Partners‘ contacts and network Gather and evaluate this feedback Examine the possibility to conduct some (phone) interviews Finalize the Technology Assessment, business plan and market study by January 2016 –Ideally utilizing the outcome from final TC of EDUSAFE prototype 28 WP5 - Vasileios Mantzios – AUEB – 22 June 2015
29
29 For your attention ! WP5 - Vasileios Mantzios – AUEB – 22 June 2015