FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including Plaster Internal – 5” and/or 3” with POP finish TREATMENT Anti termite treatment during various stages of construction. Water proofing treatment in toilet, kitchen & roof. DOORS Entrance door – Solid core polished teak door finish. Internal door – Front side polished teak finish flush doors, back side painted. WINDOWS Anodized aluminium windows with clear glass. FLOORS Flat interior – Vitrified mirror finish tiles Entrance lobby – Fully marbled or ceramic tiles flooring. Lift & stair lobby – Combination of kota, marble flooring & ceramic tiles at lift facade. KITCHEN Designer anti skid ceramic floor tiles. Kitchen walls – designer ceramic wall tiles upto 2.5 feet above kitchen counter and in wash area below kitchen sink. Kitchen counter – Black granite top with SS sink. TOILETS Anti skid ceramic designer floor tiles Hot & cold line in basin & shower area White sanitary ware of reputed brand such as Parryware or equivalent brand. CP fittings of reputed brand Walls – designer ceramic tiles upto door height. ELECTRICALS Concealed copper wiring with modular switches Plug points at all switchboards 2 L.P, 1 F.P, &1 A.C point in all bedrooms 3 L.P, 2 F.P in liv/din 1 L.P, 1 F.P in verandah TV & Telephone point in Hall & in master Bedroom CCTV with intercom facility in Hall 1 15Amp point, 2 L.P, Aqua guard, refrigerator & exhaust fan point in kitchen Washing machine point and 1 tap point in service verandah 2L.P, Geyser points and exhaust points in toilet. ELEVATOR Two hi–speed passenger lifts of OTIS/KONE or equivalent make HARDWARE FITTINGS Quality Locks & Hardware fittings of reputed brands Specifications
16
SL NO.PERCENTAGE OF CONSIDERATIONPARTICULARS 115%ON BOOKING / SIGNING OF AGREEMENT 215%ON COMPLETION OF FOUNDATION WORK 310%ON COMPLETION OF 2 ND FLOOR CASTING 410%ON COMPLETION OF 4 TH FLOOR CASTING 510%ON COMPLETION OF 6 TH FLOOR CASTING 610%ON COMPLETION OF 8 TH FLOOR CASTING 75%ON COMPLETION OF 11 TH FLOOR CASTING 85%ON COMPLETION OF BRICK WORK 95%ON COMMENCEMENT OF FLOORING 105%ON COMPLETION OF PLASTERING 115%ON COMMENCEMENT PLUMBING WORK 125%ON POSSESSION PAYMENT SCHEDULE Note: Rates as of Sep’ 08 and are subject to revision from time to time.
17
PAYMENT SCHEDULE EXTRA DEVELOPMENT CHARGES2BR3 BR4 BR Generator charges15,00020,00025,000 EPABX System5,000 Water Treatment Plant10,00015,00020,000 Apportionment & Mutation of the property in the KMC10,000 CESC transformer & meter (Excluding individual meter deposit)15,00020,00025,000 Documentation & Legal charges5,000 Separate KMC water line in Kitchen5,000 Corpus Fund20,00025,00030,000 Note: Rates as of Sep’ 08 and are subject to revision from time to time.
18
Thank You
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.