‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin
2
The Base
3
Flooring on Steel Stratco Tuff-Floor Base with 19mm GP Flooring
4
Bottom Plate All timber is 90x45 MGP 12
5
First Panel Insert corner junction stud then fit first panel Panels easily lifted into place, only weighing 20kg per sqm.
6
Corner Panel up
7
Insert stud and cyclone rod
8
Back Wall up
9
Install Top plates & Tie-Down
10
Ensure all panels are square
11
Nail off Panels
12
Door installation
13
Window Installation
14
Installing window heads
15
Cutting walls on the rake
16
Roof Installation Using the Bondor Solarspan Roof system the roof was installed in 2 hours The entire process including roof screwed on and finished was completed in 1 day!
17
Two coats paint later
18
Perfect Render Effect Finish This finish was achieved using 2 coats of Dulux Weathershield.
19
The Finished Product