Download presentation
Presentation is loading. Please wait.
Published byWilliam Gilbert Modified over 10 years ago
1
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy 3 1 2 3 4
2
City of Eugene: Neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth St to existing pathway extending from Concord St)
3
City of Eugene: neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth Street to existing pathway extending from Concord Street
4
City of Eugene: Neighborhood access to Malabon Elementary School (proposed pathway connecting Ellsworth St to existing pathway extending from Concord St)
5
City of Eugene – Malabon Elementary School: sidewalk connection to school front entrance
6
City of Eugene – Malabon Elementary School: replacement of old bike racks with hoops
7
City of Eugene: Arts & Technology Academy (1) Intersection 24 th Ave/Fillmore St: marked crosswalk/curb extensions/stutter flash units (2) Chambers St (23 rd -24 th Ave): infill sidewalk (3) 22 nd Ave (Polk St-Jefferson St): crosswalks/curb extensions/lighting/signage (4) Intersection 22 nd Ave/Jefferson St: high-visibility crosswalks/stutter flash units/lighting/signs (5) Installation of bicycle parking shelter – hoops @ school 3 2 4 1 5
8
City of Eugene – Arts & Technology Academy West 22 nd Ave Corridor (Polk St-Jefferson St): Installation of marked crosswalks/curb extensions/lighting/stutter flash units
9
City of Eugene – Arts & Technology Academy: Intersection 24 th Ave/Fillmore St (construction of marked crosswalk, curb extensions, and stutter flash unit)
10
City of Eugene - Intersection Avalon St/Frigon St: Installation of stutter flash unit 1 2 Meadow View School Prairie Mountain School
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.