1 2014 1 st Quarter February 11 th, 2013

2 Welcome / Introductions

3 Agenda  Review of recent incidents  Issues or concerns open from 2013  Non-emergency lane closures for cleanup  KYTC D-3 Interstate / Parkway Emergency Plan  Construction project updates  2014 Goals and planning

4 Recent Incidents Feb. 3 rd NB I-65 @ 6 mm Simpson Co

5 Icy conditions on bridge 0646 Post 3 reports to TOC 3 lanes blocked, 5 hrs est.blockage. Multi vehicle accident, several semi-trucks 0655 TOC notification e-mail sent to Central dist. List 0805 3 NB lanes cleared, TOC advised. Ramp still blocked 940Cleared Simpson Co SO, CVE, FSFD, KYTC & at least 3 tow companies on-scene Ramp blocked by broken trailer & loose cargo (truck parts) that had to be unloaded & picked up. Good job clearing wreckage to NB shoulder ASA P. Feb. 3 rd NB I-65 @ 6 mm Simpson Co

6 KY90 / KY163 Metcalfe Co. Jan. 12 th, 2014 approx. 9:45 am

7 2014 IM Team Goals 1.? 2.? 3.? IM Team Mission Statement

8 Issues / Concerns from 2013 KYTC role in incident planning & response TOC notification by initial responders SAFE Patrol operators needed upstream of incident at start of traffic queue “Hold harmless” legislation to allow KYTC assets to assist with cleanup. “Post-Emergency” cleanup & traffic control

9 KYTC – Our role Preliminary …… Coordinate inter-agency District IM Team Develop plan & tools to maintain safe flow of traffic in major closure incidents. Assist local emergency responders with initial traffic control as resources permit. Assume traffic control for large scale or long- term incidents. Provide equipment resources as requested to assist in incident stabilization / mitigation.

10 TOC Notification 502 564 2080 Any partial or complete closure of major roadway Law enforcement agency or initial incident commander notifies Conservative estimate of duration TOC notifies KYTC resources Remember to terminate incident with TOC

11 Post-Emergency Clean Up After emergency phase is complete / traffic flowing Non-emergency recovery, cleanup or remediation Permit to be obtained from KYTC Contractor responsible for traffic control

12 Traffic Control Resources Area Wide Protective Knoxville TN 800-343-2650 www.awptrafficsafety.com Highway Safety Services Inc. Louisville KY 502-366-5602 www.highwaysafetyequipment.com Saf-Ti-Co Louisville KY 502-772-2511 www.saftico.com RoadSafe Traffic Systems LaVergne TN 615-287-0900 www.roadsafetraffic.com *This is not a recommendation or endorsement of any provider*

13 Interstate / Parkway Emergency Plan Goal 1. Designate and document, in advance, alternate routes and response plan 2. Implement tools to communicate plan to responders and traveling public 3. Identify agencies / crews responsible for implementing plan in emergency responses Everyone has a plan & is on the same plan

14 Interstate / Parkway Emergency Plan Planned results - Route maps – primary & secondary Route signage – combination of permanent alternate and pre-placed flip-down detour type Control points for diversion & access closure Standardized setup for diversion traffic control Pre-loaded message packages for electronic message boards for rapid activation Assignments for implementing & deactivating deployments.

15 Detour Maps Detour Route Base Map Example I65 22-26 mm

16 Emergency Plan Emergency contacts – KYTC and emergency response agencies Detour route Closure / diversion points DMS messages preloaded Detour signs to deploy Critical traffic signals Additional information

17

18 Interstate / Parkway Emergency Plan Current status > I-65 0.0 – 53.4 mm Diversion traffic control plan agreed & equipment obtained & staged. Detour routes approved & base maps done Draft alt / detour route sign plan in review Traffic signal override engineering done Draft emergency plan done for each segment

19 Interstate / Parkway Emergency Plan Next steps – Complete route signage plan for I-65 Finalize maps with all elements in place Finalize plan for each segment Review with emergency response agencies & KYTC crews Continue same process for Natcher & Nunn Parkways Goal to implement I-65 plan by end of 2 nd Qtr 2014

20 FHWA TIM Update Tony Young – FHWA Frankfort

21 National Traffic Incident Management Responder Training Program Training sessions conducted in Kentucky – 21 (August 5, 2013 – January 31, 2014) Number of first responders trained – 523 Training Locations – Hopkinsville, Louisville (8), Bowling Green (2), Paducah, Hazard, Greenville, Winfield, Nancy (2), Lexington (2), Lawrenceburg (2), and Frankfort

22 Disciplines TrainedNumberPercent Law Enforcement9117% Fire/Rescue13125% Towing & Recovery4910% EMS6813% DOT/Transportation13125% Other Disciplines5310% TOTAL523100%

23 February 17, 2014Northern Kentucky ADD, Florence8am – 12pm & 1pm – 5pm February 19, 2014Grant Co. Extension Office, Williamstown (KYTC)8:30am – 12:30pm February 20, 2014Pendleton Co. Extension Office, Falmouth (KYTC)8:30am – 12:30pm February 21, 2014Laurel Co. Extension Office, London5pm – 9pm February 24, 2014Gallatin Co. Extension Office, Warsaw (KYTC)8:30am – 12:30pm February 25, 2014Boone Co. Extension Office, Burlington (KYTC)8:30am – 12:30pm March 17, 2014 Trigg Co. Rescue Office, Cadiz (KYTC)6:30pm – 10:30pm April 10, 2014EKU Stratton Building, Richmond8am – 12pm April 10, 2014EKU Stratton Building, Richmond1pm – 5pm May 14, 2014James Bruce Convention Center, Hopkinsville8am – 12pm May 14, 2014James Bruce Convention Center, Hopkinsville1pm – 5pm May 29, 2014Hart Co. Extension Office, Munfordville9am – 1pm June 4 - 5, 2014Lifesavers Conference, Louisville2:30pm – 4:30pm July 1, 2014Magoffin Co. Extension Office, Salyersville5pm - 9pm

24 Construction Updates I-65 Cave City – Horse Cave I-65 Horse Cave – Munfordville Nunn Parkway / Glasgow Outer Loop Nunn Parkway / Edmonton US 68 interchange

25 2014 - Meetings Interest in other team agencies co-hosting? – KSP – County SO, – KYEM, County EM, – Towing / recovery, – KY DEP – Emergency Response Outside subject matter experts or presentations? Involving all IM Team members and interests

26 2014 IM Team Goals IM Team Mission Statement Your agencies role in TIM OUR TEAM – OUR CHALLENGE Please respond to the questionaire you will receive by e-mail

27 Jon Lam District 3 IM Coordinator Office 270-746-7898 xt 225 Cell 270-392-8760 or 270-784-8570 Jon.lam@ky.gov http://transportation.ky.gov/District-3/Pages/TIM.aspx Presentations & other D-3 IM Team files can be found at