Presentation is loading. Please wait.

Presentation is loading. Please wait.

WATER CONDITIONING IN JURMALA GREEN BRIDGE FORUM 2015 Building the Bridge to Clean Technologies between European Union and Central Asian countries Jurmala,

Similar presentations


Presentation on theme: "WATER CONDITIONING IN JURMALA GREEN BRIDGE FORUM 2015 Building the Bridge to Clean Technologies between European Union and Central Asian countries Jurmala,"— Presentation transcript:

1 WATER CONDITIONING IN JURMALA GREEN BRIDGE FORUM 2015 Building the Bridge to Clean Technologies between European Union and Central Asian countries Jurmala, 18.04.2015.

2  Population: 55 562 that increases during summer time;  Area: 100 km 2 that includes 12 villages and 2 small historical towns (Sloka un Ķemeri);  Network: water 147,3 km; sewerage 152 km, and 75,8 km of them pressure pipes;  Connected to: water 75%, sewerage 74%; Jurmala

3  Network extension: water 90,8km, sewerage 82,2km and 6,3km of them pressure pipes;  Total project expenses: 46,7 millions EUR;  Financing:  Finishing time: spring 2016 Jurmala water development project

4 Water conditioning plants in Jurmala  WCP in Kauguri (6500m 3 /d);  WCP in Dzintari (6000m 3 /d);  WCP in Jaundubulti (6000m 3 /d);  WCP in Kemeri (210m 3 /d);

5 Kauguri water conditioning  Iron removal plant reconstructed in 2007.;  Sulphates removal (nanofiltration ) in 2013.;  Guarantee period ended in 2015.;  Expenses for construction of IRP 1,3million EUR;  Nanofiltration expenses for WCP 1,1 million EUR.

6 Dzintari water Conditioning  Iron removal plant reconstructed in 2008.;  Sulphates removal (nanofiltration ) in 2013.;  Guarantee period ended in 2015.;  Expenses for construction of IRP 0,9million EUR;  Nanofiltration expenses for WCP 0,8 million EUR.

7 Jaundubulti water conditioning  Iron removal plant reconstructed in 2008.;  Sulphates removal (nanofiltration ) in 2013.;  Guarantee period ended in 2015.;  Expenses for construction of IRP 1,5million EUR;  Nanofiltration expenses for WCP 0,8 million EUR.

8 Ķemeri water conditioning  Iron removal plant reconstructed in 2013.;  Sulphates removal (nanofiltration ) in 2013.;  Guarantee period ended in 2015.;  Expenses for construction of iron removal and nanofiltration 1,0 million EUR.

9 Water quality ParameterBefore conditioning RequirementAfter conditioning Supplied in network Fe 2+ 1,3 – 1,5mg/l0,2mg/l0,05mg/l SO 4 350-370mg/l (in Kauguri up to 400mg/l) 250mg/l15mg/l200mg/l In Jurmala potable water from tap is safe, healthy and cheap!

10 Questions? Discussion...


Download ppt "WATER CONDITIONING IN JURMALA GREEN BRIDGE FORUM 2015 Building the Bridge to Clean Technologies between European Union and Central Asian countries Jurmala,"

Similar presentations


Ads by Google