Download presentation
Presentation is loading. Please wait.
Published byLawrence Bridges Modified over 9 years ago
1
Xiang DING Presented by Aixia DOU Institute of Earthquake Science China Earthquake Administration China Earthquake Administration Friday, July 29,2011 IGARSS 2011, July 25-29, Vancouver, Canada
2
Introduction The Design Object of the System The Basic Model for Earthquake Risk Assessment Earthquake Risk Assessment The Main Functions of CERES Conclusion and Acknowledgement 22
3
The Catastrophe Earthquake Risk Estimation System (CERES for Windows) is a professional software system developed specifically for the risk assessment of catastrophe earthquakes in the next ten years in Asia. 33
4
Earthquake risk assessment Information service Earthquake risk mapping of Asia 44
5
Development Tools ArcEngine 9.2 Visual Studio VB.NET 2005 DataBase Micros oft Access Oracle Runing Environment MS Windows XP or upper version 55
6
Conventional models of ER (Wang et al, 2007) or R - the estimated seismic risk value L - the life or economic losses P(Y) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) V(Y) - the vulnerability of social wealth (life, building or economic index such as GDP) in Y W - Social wealth 66
7
A new ER model developed by Wang et al (2009) OR R - the estimated seismic risk value L - the life or economic losses P(Y) - the probability of occurrence of seismic ground motion Y (Seismic hazard probability) A - the ability of disaster reduction V(Y|A) - the vulnerability under the condition of A W - Social wealth 77
8
The basic process of risk assessment for catastrophe earthquake 88 Seismic Vulnerability Social Wealth Losses & Vulnerability of Catastrophe EQ. Social & Economic Development Factors affecting Seismic Risk Seismic Risk Seismic Hazard Activity of Catastrophe EQ.
9
The system function frame chart 99
10
SystemMenusofCERES 1010
11
1111
12
1212
13
1313 The Input of Earthquake Parameters Database maintain Add/Batch Add Delete/Batch Delete Update Cancel Find Auxiliary input list
14
1414 Query According to the User Defined Conditions
15
1515
16
1616
17
1717
18
1818
19
1919
20
Interface of Control Params for Risk Assessment 2020
21
Interface of Control Params for Risk Assessment 2121 Example of Risk Assessment
22
2222 Death toll of Ms7.1Yushu earthquake Actual: 2698 Miss: 270 Fast Estimated : 1423 Estimated Seismic Intensity Distribution of 2010 Ms7.0 Yushu Earthquake, Qinghai Province, China Interface of Control Params for Fast Loss Assessment
23
The Catastrophe Earthquake Risk Estimation System (CERES) has been showing the potential ability in practical research of risk assessment in Asia while the results have not been presented here for a limited extent of paper. The research was supported by Ministry of Science & Technology of China (NO. 2008BAC44B02). 2323
24
Thank you! 24 Ding xiang dingxiang525@163.com +86-10-88015736
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.