Download presentation
Presentation is loading. Please wait.
Published byEthan Purcell Modified over 10 years ago
1
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012
2
U.S. 26: Glencoe Road Interchange Project
3
Improve safety, capacity and traffic flow of the interchange $32 million dollars from the 2009 Jobs and Transportation Act Most traffic impacts at night. During any ramp or road closures, a signed detour will be in place. Complete in summer 2014
4
Replace the Glencoe Road bridge over U.S. 26 with a new, four-lane bridge, and improve vertical clearance Improve pedestrian and bicycle connections on the new bridge Lengthen and widen the U.S. 26 westbound off-ramp
6
$3.3 million funded through the Statewide Transportation Improvement Program (STIP) Daytime and nighttime lane closures on OR 8 Completion in December 2012.
7
Repair pavement, grind, pave and restripe OR 8 from 331 st Avenue to Quince Street Upgrade sidewalk curb ramps to ADA standards Stripe a new crosswalk across OR 8 on the east side of intersection with Quince Street: –Add a pedestrian signal for the new crosswalk –Add a raised pedestrian island at the south end of the new crosswalk
8
Local Agency Projects Council Creek Trail: Banks to Hillsboro – trail master plan. $218,000 federal money. Harvey Clarke Elementary School Sidewalk Improvement – Safe Routes to School. $300,000 federal money. OR8/OR47 Intersection Improvements - $1.3 million federal money.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.