Download presentation
Presentation is loading. Please wait.
Published byDinah Osborne Modified over 9 years ago
1
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE – Universites Paris 6 & 7) for the H.E.S.S. collaboration HESS (high energy stereoscopic system)28 th ICRC Tsukuba Japan - 5, August 2003
2
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the HESS cameras28 th ICRC Tsukuba Japan - 5, August 2003Pascal Vincent - LPNHE-Paris P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 LPNHE-Paris J-P.Denance, J.Guy, J-F.Huppert, P.Nayman, M.deNaurois, M.Rivoal, L.Rolland, J-P.Tavernet, F.Toussenel, P.Vincent LLR L-M.Chounet, B.Degrange, G.Fontaine, P.Manigot PCC P.Espigat, M.Punch MPIK-Heidelberg G.Herman, A.Kohnle, C.Masterson, T.Saitoh
3
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Requirements : Low threshold ~ 120 GeV Dynamic range up to few 10 TeV Good collection efficiency Energy resolution ~ 10-20% Fast trigger. Modularity : easy to repair Fully embedded system P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 OG 2.5 Poster 2-P-112, A K Konopelko et al.
4
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera Mechanics Modular system of 60 drawers of 16 phototubes each Only 3 cables for power supply, central trigger and network. WaterProof (pneumatic front lid protection against sun & water) Weight ~ 900 Kg
5
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Winston cones In the front of the camera 960 Winston cones collect ~70% of light
6
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Front-end electronics 60 drawers of 16 PMs (photonis PMT XP 2960) : QE ~ 25% + active bases DC-DC converter 0-1500 V HV & current readout Current limit 1 "Slow Control" card : High voltage control and monitoring Temperature & Current monitoring Counting scalers 2 cards with Analogue Memory ship (x8 PMTs).
7
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Analogue Memory ARS0 Analogue Memory ARS0 built for ANTARES experiment (SEI- Dapnia) 5 buffers /chip, 128 cells per channel. Sampling @ 1 GHz Readout ~ 1 Mhz Controlled by two parameters Readout window (~16 ns) Readout delay (50-70 ns) Readout : Sampling or integrated charge mode
8
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Readout & First level trigger ARS0 Connection to photo-tubes Trigger channels Analogue Fpga 8 x comparators Adder Enable/disable (4 channels) output local trigger Fanout signal entry Amplifications Buffers 12 bits ADC Digital Multiplexor Readout channels
9
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera trigger based on sectorisation (x64 pixels) 38 overlapping sectors
10
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Parallel transfer on 4( ↗ 8) busses Acquisition system Readout system
11
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Linearity High gain 1 ⇨ 200 e Low gain 10 ⇨ 1 600 e
12
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Single e determination @ 2.10 5 of gain
13
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Calibration System for the first camera LED system 960 LEDs with programmable intensity from 0.6 to more than 10.000 e Pulse width of ~ 2 ns Synchronisation < 1ns Controlled by camera CPU Camera response
14
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Second Calibration System LED system for gain estimation @ single e P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003
15
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 First light june 11, 2002 Installation of the first camera, by the end of may 2002 Installation of the second camera, february 2003 New busses & CPU © W.Hofmann
16
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera 3 & 4 under construction Camera 3 Camera 4 P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Busses x 4( ↗ 8) busses
17
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera 3 has left construction area for Namibia August 31, 2003 for the opening ceremony of the 28 th ICRC
18
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Acquisition speed Limited by : readout of the analogue memories. data transfer on the drawer's busses. readout by the CPU. Dead time @ 250 Hz
19
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Camera installation schedule 200220032004 Camera 1 Camera 2 +Upgrade of camera 1 Camera 3 Camera 4 +Upgrade of Cameras 1, 2 & 3 Ju ne Fevr uary Septem ber De ce m be r P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 That's all folks!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.