FY 2017-FY 2021 Project Priorities Florida-Alabama TPO Gary Kramer Senior Planner, TPO Staff www.wfrpc.org.

Similar presentations


Presentation on theme: "FY 2017-FY 2021 Project Priorities Florida-Alabama TPO Gary Kramer Senior Planner, TPO Staff www.wfrpc.org."— Presentation transcript:

1 FY 2017-FY 2021 Project Priorities Florida-Alabama TPO Gary Kramer Senior Planner, TPO Staff www.wfrpc.org

2 How a Project is Developed

3 Project Priorities are developed annually. Four public workshops over two days (May 4 and 5, 2015). Two TPO and advisory committee workshops (May 12 and June 11, 2015). Comments received from the workshops are listed in the agenda enclosure. Background

4 Project Priority Methodology Capacity Projects Bicycle/Pedestrian Related Projects

5 Project Priority Methodology Same as last year, TPO’s 2035 Long Range Transportation Plan. Completed projects are removed from the list, projects scheduled for construction in first three years are moved to the committed list and new projects are placed at the end of the priority list. New rankings for Transportation Alternatives projects based on criteria adopted by the TPO in April 2015.

6 New projects for Transportation System Management ranked based on TPO approved criteria. Public Transportation Related Projects (listed by potentials grants and furnished by the TPO’s Public Transportation Staff in consultation with region’s public providers). Aviation Projects (furnished by the Pensacola International Airport and Peter Prince Field). Project Priority Methodology

7 Port Projects (furnished by Port of Pensacola) Local Projects (furnished by local governments and TPO’s 2035 Long Range Transportation Plan) Potential Toll Projects (TPO’s 2035 Long Range Transportation Plan) Bridge Replacement Projects (TPO’s Long Range Transportation Plan) Project Priority Methodology

8 Capacity Projects (Tables 1-4). Transportation System Management Projects (Tables 5-6). Bicycle/Pedestrian Related Projects (Tables 7-13). Public Transportation Related Projects (Tables 14-15). Aviation Projects (Tables 16-17). Port Projects (Table 18). Local Projects (Table 19). Potential Toll Projects (Table 20). Bridge Replacement Projects (Table 21). Project Priority Sections

9 Any changes in Project Priorities requires 2/3 majority of the voting members present. Proposed changes Proposed Changes

10 Adoption by TPO and advisory committees at this meeting. Adopted Priorities sent to Alabama and Florida Departments of Transportation by August 11, 2015 What’s Next?

11 Gary Kramer Senior Transportation Planner Gary.Kramer@wfrpc.org (850) 332-7976 Ext. 219 or 1-800-226-8914 Brandi Whitehurst Public Involvement Coordinator Brandi.Whitehurst@wfrpc.org (850) 332-7976 Ext. 204 or 1-800-226-8914 Comments?