Download presentation
Presentation is loading. Please wait.
Published byDarrell Stewart Modified over 9 years ago
1
PRODML WG 2007 The context StatoilHydro partner in 2 Algerian fields (InSalah, InAmenas) operated by BP. Field is operated as joint venture between BP and StatoilHydro. Sonatrach is the goverment equivalent requiring different types of reports each day Currently the network infrastructure is almost non-existing, ftp the only viable connection variant Today reports are faxed to Sonatrach – the different reports covers different views of the same data Data is shipped in a wide range of different formats Involved software Energy Components (TietoEnator) and Production Monitoring and Reporting (TietoEnator)
2
PRODML WG 2007 The pilot context EC InAmenas EC InSalah TE QiM PDF PRODML Email File publish 1. Schedule 2. Generate 3. Transform 4. Validate 5. Approve 6. Publish Workflow FTP - GateWay Stavanger PMR NAS Filestore Scan filestore Publish to PMR with webservice PMR Store Algeria PMR = Production monitoring and reporting EC = Energy Components Stavanger, Norway
3
PRODML WG 2007
5
The business benefits Data is structured in a computer readable form – making it possible to load, publish to different formats, make subsets of data e.g. only extract gas composition for a given pipeline Data is transfered in a more optimal manner to the different parties involved Data is timely distributed without needed human intervention Data can be published to different production systems utilising the same format e.g. well tests are required for a lot of different applications The data stream is just published once to multiple sources Data can be more easily shared between involved parties – no need to manual punching of excel spreadsheets, txt – files and so on The different reports are based on the same datastream and one file Joint venture partners gain access to data in a more timely and structured manner
6
PRODML WG 2007
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.