Download presentation
Presentation is loading. Please wait.
Published byHilda James Modified over 9 years ago
1
Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
3
Why file production reports (PR’s) ? Statewide Rules (SWR) SWR 27 SWR 54 SWR 58 (b) Required to be filed On or Before the last working day of the month, following the month covered by the report
4
PR Information Oil/Condensate Production is reported in Barrels (BBLS) (Including any test oil and condensate) Casinghead Gas (CSGHD) and Gas Well Gas (GWG) Production is reported in thousand cubic feet (MCF) (Including test gas) Disposition Stock on hand All volumes need to be in whole numbers
5
When to file PR reports Transfer Stock Only Reclassifications Gas Wells Oil Wells
6
PR Filing Options 1.Hard Copy 2.Electronic Data Interchange (EDI) 3.On-Line
7
HARD COPY RRC Drilling 1701 D. Road Good TX 78766 000000 01 0 1 2 0 1 0 Hard Work Mike Bike 002-356-9912 2-14-12
8
Hard Copy Processing Issues Not on approved format NO SIGNATURE – signatures are required on ALL pages Only Blue or Black Ink accepted Column 2 – Lease Type Font too small – with the exception of column 1 Incorrect District/RRC Identifier and Operator Number Month/Year Field Name not on each page Breaking of RRC identifier from one page to another
9
CODES Oil / Condensate (Column 8) : Code 3 & 6 Code 4 Code 5 – Form H-8 Code 8 Code 71 Code 72 Code 73 Code 74 Code 75
10
CODES continued… Casinghead/Gas Well Gas (Column 12) : Code 4 – Vented or Flared Questions: Terry Edwards (512) 463-6785
11
Pending Drilling or American Petroleum Institue (API) Number Identifying Information needs to be correct Be Consistent with Drilling Permit Number or API Number Oil Wells
12
RRC On-Line System Methods available to submit vs. paper: 1.EDI – Electronic Data Interchange 2.CD 3.PR On-Line System
13
PR On-Line System What Can Be Viewed On-line: Current Lates and Corrected 1993 – Current Month Pending (when lease number has not been assigned) Using Drilling Permit or API Number
14
PR On-Line System continued… Filing: Read Website Requirements for Filing Electronically www.rrc.state.tx.us/electronicfiling/edifilingrequire ments.pdf Submit your Security Administrator Designation (SAD) form Receive your email from P-5 with User ID and instructions Administrator User ID cannot file on the PR system Administrator gives employees filing rights
15
EDI – Electronic Data Interchange Upload File File Upload Location: https://webapps.rrc.state.tx.us/security/login PR User ID RRC On-Line System PR EDI Upload Browse and then verify Check verified files SUBMIT Update Successful EMAIL: pr_edi_upload@rrc.state.tx.us
16
EDI – Electronic Data Interchange Upload File PR EDI Upload Email Message: File Name Upload Time 2005-05-11 11:27:43.351 Agent ID Submitter ID Agent Phone # Number of records received Number of records processed successfully Number of records dropped
17
EDI – Electronic Data Interchange Upload File Reminders: Cannot combine Current and Lates and Corrected in same file Receive an Update Successful Message E-Mail Confirmation
18
On Line System Reminders Logging On: Use PR User ID, NOT Administrator ID ONLY click on Multiple Commingling if your lease is on more than ONE permit DO NOT use same RRC identifier on different lines for addition codes Review the MONTH/YEAR and verify lease information Confirm and Submit View printable format
19
PR Query Reminders: Logged into RRC On-Line system NOT Logged into RRC On-Line system
20
Log on to the RRC website www.rrc.state.tx.us On the home page click on Data Online Research (Queries) From the Online Research Queries page scroll down to the Statewide Production Data Query System (PDQ) and click on Launch Application
25
Log on to the RRC website www.rrc.state.tx.us
31
Outstanding Discrepancies Fix Discrepancy Use this queue to view delinquent reports. Correct discrepancies
32
QUICK P-17 Form TIPS P-17 PERMIT FEE TOTAL IS $375 P-17 Permit Fee $150 As of 05/01/12, Surcharge Fee $225 Turbine and Coriolis Exception Meters Fee is $375 Per meter FEE EXCEPTION CANCELLATION
33
QUESTIONS ??
34
Contact Information P-17 Darlene Williams (512) 463-6873 darlene.williams@rrc.state.tx.us Production General Phone Line (512) 463-6726 ProductionReporting-Info@rrc.state.tx.us
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.