Download presentation
Presentation is loading. Please wait.
Published byBlake Wells Modified over 9 years ago
2
2008 Pouring of the foundation / septic tank and installation of outdoor plumbing
3
Is there more coming
4
On a count of three, smile
5
Keep it coming
6
Where should we start
7
I’ll guide, you shovel
8
Don’t waste any, this stuffs expensive
9
Hope this does not blow-out
10
Boy I’m glad that is done
11
OK, who is going to be the first to use it?
12
200 9 Start the framing and erecting of the walls and roof
13
I think this is right
14
Hurry-up with the flooring
15
Coffee Break
16
Hope it works
17
This doesn’t look right
18
It’s OK as is
19
Don’t drop it on your foot
20
Do it, nobody will know
21
What side goes up?
22
HEY, I didn’t screw-up
23
Was that ½” or ¾ ”
24
How many nails you want?
25
I’m only showing you once
26
It’s straight enough
27
Wall 40 ft long x 20 ft high
28
Got one up, now another
29
This is a piece of cake now
30
Do they have a permit?
31
Don’t rush us
32
I think it will work
33
Couple more and we will be done
34
Wow! Looks big
35
Be careful up there
36
Ready for winter
37
Is this an airplane hanger?
38
That’s one tall door
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.