A Project Is Not a Black Box Principles of Corporate Finance Sixth Edition Richard A. Brealey Stewart C. Myers Lu Yurong Chapter 10 McGraw Hill/Irwin
2
10- 2 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Topics Covered Sensitivity Analysis Break Even Analysis Monte Carlo Simulation Decision Trees
3
10- 3 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved How To Handle Uncertainty Sensitivity Analysis - Analysis of the effects of changes in sales, costs, etc. on a project. Scenario Analysis - Project analysis given a particular combination of assumptions. Simulation Analysis - Estimation of the probabilities of different possible outcomes. Break Even Analysis - Analysis of the level of sales (or other variable) at which the company breaks even.
4
10- 4 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Sensitivity Analysis Example Given the expected cash flow forecasts for Otobai Company’s Motor Scooter project, listed on the next slide, determine the NPV of the project given changes in the cash flow components using a 10% cost of capital. Assume that all variables remain constant, except the one you are changing.
5
10- 5 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Sensitivity Analysis Example - continued NPV= 3.43 billion Yen
6
10- 6 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Sensitivity Analysis Example - continued Possible Outcomes
7
10- 7 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Sensitivity Analysis Example - continued NPV Calculations for Optimistic Market Size Scenario NPV= +5.7 bil yen
8
10- 8 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Sensitivity Analysis Example - continued NPV Possibilities (Billions Yen)
9
10- 9 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Break Even Analysis Point at which the NPV=0 is the break even point Otobai Motors has a breakeven point of 85,000 units sold. Sales, 000’s PV (Yen) Billions 400 200 19.6 85 200 Break even NPV=0 PV Inflows PV Outflows
10
10- 10 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Monte Carlo Simulation Step 1: Modeling the Project Step 2: Specifying Probabilities Step 3: Simulate the Cash Flows Modeling Process
11
10- 11 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? -150 0 or Turboprop Piston
12
10- 12 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? -150 0 or 812 456 660 364 148 Turboprop Piston
13
10- 13 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? -150 0 or 812 456 660 364 148 Turboprop Piston
14
10- 14 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) -550 NPV= ? -250 NPV= ? -150 0 or 812 456 660 364 148 +150(.6) +30(.4) +100(.6) +50(.4) *450 331 Turboprop Piston
15
10- 15 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) -550 NPV= ? -250 NPV= ? -150 0 or 812 456 660 364 148 +150(.6) +30(.4) +100(.6) +50(.4) NPV=444.55 NPV=888.18 NPV=550.00 NPV=184.55 *450 331 Turboprop Piston
16
10- 16 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) 812 456 660 364 148 +150(.6) 710.73 +30(.4) +100(.6) 403.82 +50(.4) -150 0 *450 331 or NPV=444.55 NPV=888.18 NPV=550.00 NPV=184.55 -550 NPV= ? -250 NPV= ? Turboprop Piston
17
10- 17 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) 812 456 660 364 148 +150(.6) 710.73 +30(.4) +100(.6) 403.82 +50(.4) -550 NPV=96.12 -250 NPV=117.00 -150 0 *450 331 or NPV=444.55 NPV=888.18 NPV=550.00 NPV=184.55 Turboprop Piston
18
10- 18 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) 812 456 660 364 148 +150(.6) 710.73 +30(.4) +100(.6) 403.82 +50(.4) -550 NPV=96.12 -250 NPV=117.00 -150 0 *450 331 or NPV=444.55 NPV=888.18 NPV=550.00 NPV=184.55 Turboprop Piston
19
10- 19 McGraw Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved Preparation for Next Class Please read: BM Chapter 11, P291-308
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.