Download presentation
Presentation is loading. Please wait.
Published byGervais Norton Modified over 9 years ago
2
Bangkok September, 2012 1
3
Economic Integration 2 Bangkok September, 2012
4
3 Model Migration STRADA- CUBE VOYAGER Model Validation against Traffic Counts Forecast Usage on the proposed Expressway Economic Integration The Assignment TIME FRAME 6 Weeks Bangkok September, 2012
5
4 Model Migration Matrices Networks General The Final Model Structure Bangkok September, 2012
6
5 The Project MULTI MODAL TRANSPORT MODEL OF VIETNAM Vietnam Statistics: Year Population GDP 2006 84.8 38.7 2022 95.9 86.7 (Mil) (Bil$) Bangkok September, 2012
7
6 STRADA SYSTEM FOR TRAFFIC DEMAND ANALYSIS Developed byJICA (Japan International Cooperation Agency) Bangkok September, 2012
8
7 STRADA PROGRAMS JCMA03 Combined Modal Split and Assignment Model JDAM03 Disaggregate Model JEVL03 Evaluator JGIS03 GIS Converter JHWR03Highway Reporter JICA03 Intersection Analyzer JINA03 Incremental Assignment JLPA03 LP Assignment JMTM03Matrix Manipulator JNTE03 Network Editor JODB03 OD Calibrator JSUE03 Stochastic User Equilibrium Assignment JTUE03 Time of Day User Equilibrium Assignment JTLE03 Transit Line Editor JTRA03 Transit Assignment JUEA03 User Equilibrium Assignment JTMB03 Trip Matrix Builder Bangkok September, 2012
9
8 Matrix Conversion File Format---CSV FILEI MATI[1] = "C:\VIETNAM\MODEL\DISTRIBUTION\DIMAT00B.DBF", Pattern=IJM:V, FIELDS=origin,destin,0,car,bus,inland,railway,air Strada Format Output to CSV then sort to DBF Read into CUBE Bangkok September, 2012
10
9 Estimation of Base 2006 Matrix Bangkok September, 2012
11
10 Network Conversion Step 1 - GIS Converter of STRADA~MIF Shape for each mode-Strada Network Step 2 - GIS Converter ~Convert to Arcview Network Step 3 – Develop Database Program to Modify some fields Step 4 – Load Network Database together with Shape File into Voyager, and link with other GIS data such as zone boundaries. WE WILL SEE A DETAILED PICTURE OF THE FULL NETWORK LATER Bangkok September, 2012
12
11 The Multimodal Network MULTI MODAL TRANSPORT MODEL OF VIETNAM Bangkok September, 2012
13
12 Model Parameters and Equations Parameters for Trip Generation, Trip Distribution and Modal Split were taken from the earlier study report documentation The modules were developed for both person and freight trips Base Voyager Model was re-run to ensure outcome of the same results Bangkok September, 2012
14
13 The National Multimodal Transport Model Freight and Person Trips Road, Rail, Water and Air Incorporates a Matrix Estimation Procedure via CUBE Analyst
15
14 An Economic Module Overview The Procedure Economic Parameters The Voyager Code Bangkok September, 2012
16
15 An Overview Transport ModelEconomic Analysis Transport Model Output in the form of pcu-km and pcu-hr Passenger Model Output in the form of passenger-km and passenger hours Post Transport Model Economic Analysis TOGETHER
17
16 Why an Economic Module? Often the Transport Model is removed from economic analysis The Economic Analysis is a separate program or spreadsheet analysis BUT WHAT IF? Establish an Economic Framework Each Model Run produces an economic cost or financial cost or revenue Previously we have done this using sometimes add on programs Bangkok September, 2012
18
17 North Vietnam—Detailed Study Area showing Project for Evaluation Toll Expressway Link Between China and Hanoi
19
18 National transport model
20
19 Economic Procedure THREE INPUT LOOKUP TABLES 1.Linked to Economic Growth for a Scenario 2.Vehicle Operating Costs by Link Class 3.Accident Costs Key Output File 1.Link File with Costs appended for each Link 2.Economic Summary File, Economic Cost of Project Pilot Program 1.Creates a File name and directory for economic costs for a particular scenario eg
21
20 Creation of Economic Curves Prepared for 11 Vehicle Classes HDM4 Relationships incorporated from REDS (Roads Economic Decision Model) Vehicle Operating Cost calculated for a specified range of speeds for pre determined road conditions such as roughness, gradient and curvature
22
21 An Interlude An Interlude ---The HDM-4 Model, a tool of the World Bank ù Analytical tool for engineering and economic assessment of - road investments and maintenance - transport pricing and regulation ù Physical and economic relationships derived from extensive research on road deterioration, the effects of maintenance activities, and vehicle operation and user costs Bangkok September, 2012
23
22 Economic Parameters and Conclusion of Procedure
24
23 Cost Lookup Table Input Operating Cost Curves as a Function of Speed Three Non Expressway Terrain Classes-Mountainous, Rolling and Flat and one Expressway Class 11 Vehicle Classes Cost = a+b*Speed+c*Speed 2 Bangkok September, 2012
25
Futura 07 Palm Springs 24 Vehicle Operating Cost Curve as a Function of Speed Note: This is an estimation for specified gradient, curvature and roughness (IRI) value of 5. Bangkok September, 2012
26
25 Summary Output File Bangkok September, 2012
27
26 Creation of With and Without Project for Estimation of Economic Benefits Produce four Different Files of With and Without Expressway for Specified Toll Level Bangkok September, 2012
28
27 Output Scenario Names FILE STRUCTURE
29
28 The Voyager Code tolla={Toll_Rate} toll_str=ltrim(str(tolla,4,0)) a='VND' subdir=a+toll_str ; year=str({Year},4,0) yr1='Yr' yr=yr1+substr(year,3,2) ; expx='_Exp_' If('{SCENARIO_SHORTNAME}'='NoExpressway')expx='_NoExp_' ; gen='NoGen' If({Generation}=1)gen='WithGen' ; ;Prepare File Name in Three steps to specify year and with or without expressway or generation ; Format-- Yr12_Exp_WithGen ; write into subdirectory of toll class ; filena=yr+expx filenam=filena+gen ; ext='.csv' filename=filenam+ext *MD c:\vietnam\economic_tr\@subdir@ *copy "{SCENARIO_DIR}\ECO_COST.CSV" c:\vietnam\economic_tr\@subdir@\@filename@ Bangkok September, 2012
30
29 Project Status CURRENT STATUS Economic Cost estimated for each scenario With and without Cases from CUBE Voyager written to CSV Files Economic evaluation Spread sheet still not in Voyager but linked directly to Voyager output files Simply Open Economic Spreadsheet and Update Links to Produce EIRR for any scenario Bangkok September, 2012
31
30 Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.