Presentation is loading. Please wait.

Presentation is loading. Please wait.

York Sewer District Internships and Succession Planning.

Similar presentations


Presentation on theme: "York Sewer District Internships and Succession Planning."— Presentation transcript:

1 York Sewer District Internships and Succession Planning

2 YORK SEWER DISTRICT Located in York Beach, Maine We are a 3.0 MGD Facility, with average flow of 1.2 to 1.5 MGD The collection system has 12 major pump stations, over 130 residential grinder pump stations, and over 30 miles of pipe lines dating back to the late 1800’s. Staffing levels consist of 3 personnel in collections, 3 personnel in the treatment facility, and 3 administrative staff ranging from 20 hours a week to 36.

3 Internships and Succession Planning What Are The Organization’s Goals What Are Your Needs How To Get Started Are There Resources Available In The Area

4 Wastewater Degree Worked With Area Superintendents And Professor Dana Peck To Develop And Fund A Wastewater Certificate/Associate Degree Program Unsuccessful Setting Up Program But…. Helped Us To Re-evaluate Our Own Focus

5

6 We Started Slowly

7 Manhole Locations & Inspection

8 Really Old Intern

9 Pipe Bursting

10 Intern To Veteran In 4 Months

11 Justin moving up increasing his knowledge, or in this case down into a pump station.

12 Nice Internship If You Can Get It.

13 Mechanical Internship

14 Intern To Veteran In 4 Weeks

15 Start Em Young

16 Succession Planning Where’s Tim???

17 Succession Planning

18


Download ppt "York Sewer District Internships and Succession Planning."

Similar presentations


Ads by Google